Section VII: Check-out Procedure
Check-off steps as completed.
□ ■ 1. Boiler and heat distribution units filled with water?
2. Automatic air vent, if used, open one turn?
3. Air purged from system?
4. Air purged from gas piping? Piping checked for leaks?
5. Are proper orifices installed? Check page 5 for proper
DANGER
Proper orifices must be used.
Failure to do so will cause se¬
vere injury, death or substan¬
tial property damage.
6. Follow operating/lighting instruction label on boiler
for proper start-up. Also refer to "lb Place in Opera¬
tion," page 11.
O
7. Proper burner flame? Refer to "Check Burner Flames,"
page 12.
8. Tfest limit controls: While burners are operating, move
indicator of high limit control below actual boiler
water temperature. Burners should go off while cir¬
culator continues to operate. Raise limit control above
boiler water temperature and burners should reignite.
9. Tfest any additional field-installed controls: If boiler
has low water cut-off, additional high limit or other
controls, test for operation as outlined by manufac¬
turer. Burners should be operating and should go off
when controls are tested. When controls are restored,
burners should reignite.
□ 10. Button on spill switch pushed in?
□ 11. Tfest ignition system shut-off device:
a. For standing pilot - TUm gas cock knob to PILOT
position and extinguish pilot flame. Pilot gas flow
should stop in less than 3 minutes. Put system back
into operation (see page 11).
b. For intermittent- ignition systems - Connect ma¬
nometer to outlet side of gas valve. Start boiler, al¬
lowing for normal start-up cycle to occur and main
burners to ignite. With main burners on, manually
shut off gas supply at manual main shut-off gas
valve. Burners should go off. Open manual main
shut-off gas valve. Manometer should confirm there
is no gas flow. Pilot will relight, flame sensing ele
ment will sense pilot flame and main burners re¬
ignite.
□ 12. High limit control set to design temperature require
ments of system? Maximum high limit setting is 240°F
□ 13. For multiple zones, flow adjusted so it is about th<
same in each zone?
□ 14. Thermostat heat anticipator set properly? Refer t(
"Install Room Thermostat" page 10, and wiring dia
gram on jacket door.
□ 15. Boiler cycled with thermostat? Raise to highest set
ting. Boiler should go through normal start-up cycle
Lower to lowest setting. Boiler should go off.
□ 16. Measure gas input (natural gas only):
a. Operate boiler 10 minutes.
b. T\im off other appliances.
c. At natural gas meter, measure time (in seconds
required to use one cubic foot of gas.
d. Calculate gas input:
3600x1000
— —
——
=
Btuh
number of seconds from step C
e. Btuh calculated should approximate input ratinj
on rating label.
□ 17. Check manifold gas pressure by connecting manome
ter to downstream test tapping on main gas valve
Manifold gas pressure for natural gas should be 3
V
inches water column and for propane gas should be 1(
inches water column.
D
18. Several operating cycles observed for proper operation-
See Control Supplement for damper check-out procedure.
□ 19. Room thermostat set to desired room temperature?
□ 20. Installation and Service Certificate on this page com
pleted?
□ 21. All instructions shipped with this boiler reviewed witl
owner or maintenance person, returned to envelop
and given to owner or displayed near boiler?
Installation and Service Certificate
BOILER MODEL.
.SERIES.
.CP NUMBER.
DATE INSTALLED.
BTU INPUT.
□ Installation instructions have been followed.
□ Check-out sequence has been performed.
□ Above information is certified to be correct.
□ Information received and left with owner/maintenance person.
Installer.
(Company)
(Address)
(Phone)
(Installer's Signature)