Pioneer DV-585A-A Service Manual page 61

Table of Contents

Advertisement

NOTE
1. In case of the Pulley Motor installation, check if the value
of the Fig. 2-3-B is correct.
2. When installing the wire of the Loading Motor PCB Ass'y,
install it correctly as Fig. 2-3-C.
Manual soldering conditions
¢ Soldering temperature: 350 + 5°C
* Soldering time: Within 4 seconds
* Soldering combination: Sn-3.0Ag-0.5Cu
3. When installing the Loading Motor PCB Ass'y, install it
correctly as Fig. 2-3-D.
4, In case of the Loading Motor PCB Ass'y installation, hook
the wire on the Loader Sub Ass'y as shown Fig. 2-3-E.
Pulley Motor
7.040.1mm
Loading Motor
Safety surface for pressing
of the insert.
BROWN (1) S$]
WHITE (2) $833
Fig. 2-3-C
The Lever should be position
between A and B.
Check Hook
Check Hook
=
0
Tia
Loading Motor PCB Ass'y
Check Hook
Lo
2-4: RACK LOADING/MAIN GEAR/PULLEY GEAR
(Refer to Fig. 2-4-A)
1. Unlock the support © and remove the Gear Pulley.
2. Remove the Gear Main.
:
3. Press down the catcher @ and slide the Rack Loading.
Gear Pulley
Gear Main
Loader Sub Ass'y
Fig. 2-4-A
NOTE
1. In case of the Rack Loading installation, hook the Rack
Loading on the Loader Sub Ass'y as shown Fig. 2-4-B.
2. When installing the Gear Main, take care the direction
of up or down as shown Fig. 2-4-C.
Rack Loading
Ee
cI
SS
LI
O
Fig, 2-4-B
Main Gear
Down Side
2-5: CLAMPER ASS'Y (Refer to Fig. 2-5-A)
1. Press the Clamper and rotate the Plate Clamper clockwise,
then unlock the 3 supports @.
2. Remove the Plate Clamper, Magnet Clamper and Clamper.
GE
Plate Clamper
23
Magnet Clamper
&
Main Frame
61

Advertisement

Table of Contents
loading

Table of Contents