Download Print this page

Titan 190522 Operator's Manual page 8

Forklift mounted telehandler basket

Advertisement

STEP 3: INSTALLING GUARD RAILING
1. Rest UPRIGHT POST ASSY (7) on the center of the FRONT side
holes. Insert CARRIAGE BOLT M10x80 (3) through the bolt holes from the top and place FLAT
WASHER M10 (4), SPRING WASHER M10 (5) and HEXA NUT M10 (6) onto the end of the bolt.
Then insert CARRIAGE BOLT M10x60 (11) through the holes from the side of the
and place FLAT WASHER M10 (4), SPRING WASHER M10 (5) and HEXA NUT M10 (6) onto the
end of the bolt.
Fasten but do not tighten hardware.
2. Attach the end of the CENTER GUARD RAILING (19) to the CORNER FRAME-1 (13) using
CARRIAGE BOLT M10x65 (15), FLAT WASHER M10 (4), SPRING WASHER M10 (5) and HEXA
NUT M10 (6).
Fasten but do not tighten hardware.
3. Attach the other end of CENTER GUARD RAILING (19) to the UPRIGHT POST ASSY (7) using
RAILING MOUNT PLATE (21), CARRIAGE BOLT M10x70 (2), FLAT WASHER M10 (4), SPRING
WASHER M10 (5) and HEXA NUT M10 (6). Fasten but do not tighten hardware.
4. Repeat the above procedures 2 to 3 to mount the second half CENTER GUARD RAILING (19)
onto the other side at the FRONT of the
STEP 2 ASSY
STEP 2
ASSY.
and align bolt
STEP 2 ASSY
8

Advertisement

loading

This manual is also suitable for:

Tlebsk4x98v2