Download Print this page
Titan 190522 Operator's Manual

Titan 190522 Operator's Manual

Forklift mounted telehandler basket

Advertisement

Quick Links

4'x 9' 8" FORKLIFT MOUNTED
TELEHANDLER BASKET
TLEBSK4X98v2
190522
Operator's Manual
Read the Operator's Manual entirely. When you see this
symbol, the subsequent instructions and warnings are
serious follow without exception. Your life and the lives
of others depend on it!

Advertisement

loading

Summary of Contents for Titan 190522

  • Page 1 4'x 9' 8" FORKLIFT MOUNTED TELEHANDLER BASKET TLEBSK4X98v2 190522 Operator’s Manual Read the Operator’s Manual entirely. When you see this symbol, the subsequent instructions and warnings are serious follow without exception. Your life and the lives of others depend on it!
  • Page 2 PARTS DIAGRAM / EXPLODED VIEW WHOLE ASSEMBLY...
  • Page 3: Base Platform

    BASE PLATFORM...
  • Page 4 DOME HEAD CARRIAGE BOLT M10x120 (11) DOME HEAD CARRIAGE BOLT M10x60 (12) DOOR FRAME (TLEBSK06) (13) CORNER FRAME-1 (TLEBSK04) (14) TITAN LOGO (15) DOME HEAD CARRIAGE BOLT M10x65 (16) PLASTIC TUBE END CAP (17) DOOR SWING STOPPER PLATE (TLEBSK11) (18) TOP GUARD RAILING—2 (TLEBSK4X9802A)
  • Page 5 DESCRIPTION (31) SPRING WASHER M16 (32) FLAT WASHER M16 (33) LOGO PROTECTIVE PLATE (34) HEXA BOLT M10x80 (35) WARNING LABEL-1 (36) WARNING LABEL-2 (37) HEXA LOCK NUT M10 (38) SERIAL PLATE (39) HARNESS RING (40) SIDE FRAME (41) HEXA NUT M16 (#8.8 GRADE) (42) CENTER FRAME (43)
  • Page 6: Special Notes

    ASSEMBLY INSTRUCTIONS SPECIAL NOTES: − Build on flat and level ground − Avoid tightening bolts down completely until the rack is fully assembled − Reference positions: left/right/front/back are from forklift cab viewing the work platform − The order of assembling hardware kit is always to push BOLT through the holes, and then −...
  • Page 7 STEP 2: INSTALLING CORNER FRAMES 1. Rest CORNER FRAME-1 (13) on the left/front corner of the BASE PLATFORM ASSY (A) and align bolt holes. Insert CARRIAGE BOLT M10x80 (3) from top through the hole at the long side of platform and place FLAT WASHER M10 (4), SPRING WASHER M10 (5) and HEXA NUT M10 (6) onto the end of the bolt.
  • Page 8 STEP 3: INSTALLING GUARD RAILING 1. Rest UPRIGHT POST ASSY (7) on the center of the FRONT side STEP 2 ASSY and align bolt holes. Insert CARRIAGE BOLT M10x80 (3) through the bolt holes from the top and place FLAT WASHER M10 (4), SPRING WASHER M10 (5) and HEXA NUT M10 (6) onto the end of the bolt.
  • Page 9 5. Repeat the above procedures 1 to 4 to mount the upright post and center guard railing onto the BACK side of the STEP 2 ASSY. 6. Attach the end of TOP GUARD RAILING-1 (20) to CORNER FRAME-1 (13) on the left side using CARRIAGE BOLT M10x60 (11), FLAT WASHER M10 (4), SPRING WASHER M10 (5) and HEXA NUT M10 (6).
  • Page 10 1. Attach 2 halves of HARNESS SAFETY BAR (28) together using HEXA BOLT M8x35 (27), FLAT WASHER M8 (26), SPRING WASHER M8 (25) and HEXA NUT M8 (24). Tighten hardware. 2. Insert HARNESS RING (39) into the connected HARNESS SAFETY BAR (28). 3.
  • Page 11 3. Mount DOOR LATCH ASSY (29) onto CORNER FRAME-1 (13) using HEXA BOLT M10x80 (34) and HEXA LOCK NUT M10 (37). Tighten hardware. Do this for both the front and back of the work platform. 4. Close DOOR FRAME (12) with DOOR LATCH ASSY (29) and insert DOOR LOCK SAFETY PIN (22) . Do this for both the front and back of the work platform.
  • Page 12 1. Attach TOE COVER-L (45) onto STEP 5 ASSY (E) on one side (front or back of platform) using HEXA BOLT M8x20 (44), SPRING WASHER M8 (25) and FLAT WASHER (26). Fasten, but do not tighten. 2. Attach TOE COVER-R (46) onto STEP 5 ASSY (E) on one side (front or back of platform) using HEXA BOLT M8x20 (44), SPRING WASHER M8 (25) and FLAT WASHER (26).
  • Page 13 QUALIFIED OPERATOR − Work platform operator must acquire appropriate qualification or license to work in elevated height according to requirements of local regulations. − Forklift or telehandler operator must acquire appropriate qualification or license and fully trained to maneuver elevated loads. −...
  • Page 14 − Move forklift to designated lifting position and make sure that the forklift or telehandler is in parking brake (engage outrigger if available) before elevating personnel. − Platform personnel should enter work platform on ground. After entering platform, engage the gate latch and safety pin and make sure the gates are locked securely. Put on safety lanyard or harness and lock it on the harness ring before signaling forklift operator to elevate.
  • Page 15: Specifications

    AFTER USE AND MAINTENANCE − Only qualified peronnel should make repairs to the work platform. After completing repair and maintenance, check if the work platform is in good conditions. − Inspection and maintenance can only be conducted with engine turned off and auxiliary pressure completely disengaged.
  • Page 16 Titan, its insurers, employees, officers, directors, associates, and agents from any and all claims, demands, damages, rights of action, or causes of action, present or future, whether the same be known or unknown, anticipated, or unanticipated, resulting from or arising out of the use of said equipment.
  • Page 17 NEED HELP? CONTACT US FIRST. 1-800-605-7595 info@palletworks.com www.palletforks.com © 2024 Titan Brands...

This manual is also suitable for:

Tlebsk4x98v2