Page 1
Date Prepared by Approved by Document nos Revision 14 Aug 2023 Ray Ling Pavel MS-24C180I-IM-001 INSTRUCTION MANUAL MS-24C180-I TABLE OF CONTENTS: 1.00 BEAMS & CONNECTORS: 1.10 Plan View Resultant Beam Direction 1.20 Plan View Connector Layout 1.30 Connector Port Table 2.00...
Page 2
1.00 BEAMS & CONNECTORS: 1.10 Plan View Resultant Beam Direction Page...
Page 3
1.20 Plan View Connector Layout 1.30 Connector Port Table Page...
Page 5
3.00 TRANSPORTATION / INSTALLATION 3.10 Transportation (From Point to Point) Strictly comply to the Local authority and regulatory on Workplace Safety and Health Control and Measure when moving and transportation of large or heavy equipment, appropriate material handling machine should be use. (Risk Assessment apply for Forklift or Pallet Truck Lifting) 3.20 Bracket Mounting...
Page 6
3.30 Installation using a crane Strictly comply to the local authority and regulatory on Workplace Safety and Health Control and Measure when performing lifting of large or heavy equipment, appropriate material handling machine should be used and only certified personnel should perform the task. (Risk Assessment requirement applies for both Up-Lifting and Down-Lifting.) 3.31 Lifting the Antenna...
Page 7
3.40 Antenna Installation With reference to "Bracket Mounting" Procedure, End user is required to Custom-Make the additional supporting bracket and tighten it to the existing Antenna bracket to meet the deployment needs. 3.41 Antenna Levelling After the Antenna is mounted to the bracket, it is required to be adjusted to 0˚ (Zero Degree) with ≤0.2˚...
Need help?
Do you have a question about the MS-24C180-I and is the answer not in the manual?
Questions and answers