Texas Instruments SW14J59EVM JESD204C User Manual
Texas Instruments SW14J59EVM JESD204C User Manual

Texas Instruments SW14J59EVM JESD204C User Manual

Data capture and pattern generator card

Advertisement

Quick Links

www.ti.com
User's Guide
TSW14J59EVM JESD204C Data Capture and Pattern
Generator Card
This user's guide describes the characteristics, operation, and use of the TSW14J59EVM JESD204C high-
speed data capture and pattern generator card. Throughout this user's guide, the abbreviations EVM, and the
term evaluation module are synonymous with the TSW14J59EVM, unless otherwise noted.
1
Introduction.............................................................................................................................................................................2
2
Functionality............................................................................................................................................................................2
2.1 ADC EVM Data Capture....................................................................................................................................................
2.2 DAC EVM Pattern Generator.............................................................................................................................................
Configuration.........................................................................................................................................................5
3.1 Power Connections............................................................................................................................................................
3.2 Switches, Jumpers, and LEDs...........................................................................................................................................
3.3
LEDs...................................................................................................................................................................................6
Start-Up..................................................................................................................................................................12
Instructions.....................................................................................................................................................12
4.2 USB Interface and Drivers...............................................................................................................................................
5 Downloading Firmware........................................................................................................................................................
TSW14J59EVM.........................................................................................................................................................2
Figure 2-2. TSW14J59EVM Block Diagram................................................................................................................................
File................................................................................................................................................................11
Figure 5-1. Select ADC or DAC Firmware to be Loaded...........................................................................................................
Figure 5-3. Select Device Under Test and Operating Mode......................................................................................................
Figure 5-4. Example When Connected to an ADC12DJ3200EVM Using JMODE30................................................................
Table 3-2. Jumper Description of the TSW14J59 Device............................................................................................................
Connectors.........................................................................................................................................................6
Trademarks
TI
®
, Xilinx
®
, Kintex
®
, UltraScale
®
Microsoft
and Windows
All trademarks are the property of their respective owners.
SLWU095 - APRIL 2023
Submit Document Feedback

Table of Contents

List of Figures
Device............................................................................................................................9
Device.................................................................................................................................10
Number...............................................................................................................................13
Manager......................................................................................................................................13
Level......................................................................................................14
EVM...............................................................................................................................16
List of Tables
Device..............................................................................................................5
TSW14J59.........................................................................................................7
®
, and Vivado
®
are registered trademarks of Xilinx Incorporated.
®
are registered trademarks of Microsoft Corporation.
Copyright © 2023 Texas Instruments Incorporated
ABSTRACT
Device.........................................................................6
TSW14J59EVM JESD204C Data Capture and Pattern Generator Card
Table of Contents
4
4
5
5
12
14
3
14
15
15
5
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SW14J59EVM JESD204C and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments SW14J59EVM JESD204C

  • Page 1: Table Of Contents

    ® Microsoft and Windows are registered trademarks of Microsoft Corporation. All trademarks are the property of their respective owners. SLWU095 – APRIL 2023 TSW14J59EVM JESD204C Data Capture and Pattern Generator Card Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 2: Introduction

    DDR4 reference clock and a general purpose clock. Figure 2-1 shows the TI TSW14J59 evaluation module. Figure 2-1. TSW14J59EVM TSW14J59EVM JESD204C Data Capture and Pattern Generator Card SLWU095 – APRIL 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 3: Figure 2-2. Tsw14J59Evm Block Diagram

    GPIO, I2C Data, Device CLK, SYSREF, SYNC, GPIO FMC+ Connector ADC, DAC or AFE EVM Figure 2-2. TSW14J59EVM Block Diagram SLWU095 – APRIL 2023 TSW14J59EVM JESD204C Data Capture and Pattern Generator Card Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 4: Adc Evm Data Capture

    ADC capture mode, the DAC pattern generator mode uses information from the .csv file to load predetermined JESD204C_B interface information to the FPGA. TSW14J59EVM JESD204C Data Capture and Pattern Generator Card SLWU095 – APRIL 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 5: Hardware Configuration

    Status LEDs enable. With shunt on pins 1–2, LEDs are disabled. With shunt on pins 2–3, 1 to 2 LEDs are enabled. SLWU095 – APRIL 2023 TSW14J59EVM JESD204C Data Capture and Pattern Generator Card Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 6: Leds

    3.3V or 1.8V CMOS logic trigger input to FPGA pin L23. A shunt on pins 1-2 of J21 sets the level to 3.3V (default). A shunt on pins 2-3 sets the level to 1.8V. TSW14J59EVM JESD204C Data Capture and Pattern Generator Card SLWU095 – APRIL 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 7: Table 3-5. Fmc+ Connector Description Of The Tsw14J59

    DP12_TX_P/N Z28 and Z29 Lane 12± (C → M) JESD Serial data transmitted from carrier and received by mezzanine SLWU095 – APRIL 2023 TSW14J59EVM JESD204C Data Capture and Pattern Generator Card Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 8 C39, D32, D36, 3.3V output supply D38, D40, Z40 VADJ E39, G39, H40, Adjustable output supply. Default set to 1.8V. TSW14J59EVM JESD204C Data Capture and Pattern Generator Card SLWU095 – APRIL 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 9: Figure 3-1. Add Configuration Memory Device

    Figure 3-1. Add Configuration Memory Device 7. In the pop-up window, search for the “mt25qu256-spi-x1_x2_x4” component. Click the OK button. SLWU095 – APRIL 2023 TSW14J59EVM JESD204C Data Capture and Pattern Generator Card Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 10: Figure 3-2. Programming Memory Device

    8. Right click on device “mt25qu256-spi-x1_x2_x4”, and click on Program Configuration Memory Device (see Figure 3-2). Figure 3-2. Programming Memory Device TSW14J59EVM JESD204C Data Capture and Pattern Generator Card SLWU095 – APRIL 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 11: Figure 3-3. Config File

    TSW14J59EVM. This interface also allows the user to monitor the status of the FPGA core power supply U1, TI part number TPS40428. SLWU095 – APRIL 2023 TSW14J59EVM JESD204C Data Capture and Pattern Generator Card Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 12: Software Start-Up

    1. Click on the High-Speed Data Converter Pro icon that was created on the desktop panel, or go to C:\Program Files\Texas Instruments\High Speed Data Converter Pro and double click on the executable called High Speed Data Converter Pro.exe to start the GUI.
  • Page 13: Figure 4-1. Tsw14J59Evm Serial Number

    Attempt to connect to the board using the GUI. If the problem still exists, then cycle power to the board and repeat the prior steps. Figure 4-2. Hardware Device Manager SLWU095 – APRIL 2023 TSW14J59EVM JESD204C Data Capture and Pattern Generator Card Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 14: Downloading Firmware

    .bin or .bit formatted files that are provided with the software package. The files used by the GUI reside in the directory called C:\Program Files\Texas Instruments\High Speed Data Converter Pro\14J59 Details\Firmware. Follow the steps below: 1.
  • Page 15: Figure 5-3. Select Device Under Test And Operating Mode

    EVM, consult the High-Speed Data Converter Pro GUI User's Guide and the individual EVM User’s Guide, available on www.ti.com. SLWU095 – APRIL 2023 TSW14J59EVM JESD204C Data Capture and Pattern Generator Card Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 16: Figure 5-5. Gui Does Not Connect To Evm

    If this fails, then cycle the power switch to re-initialize the power-up sequencer to try to correct this problem. Figure 5-5. GUI Does Not Connect to EVM TSW14J59EVM JESD204C Data Capture and Pattern Generator Card SLWU095 – APRIL 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 17 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 18 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 19 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 20 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 21 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...
  • Page 22 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...

Table of Contents