Download Print this page

Hama EWS-152 Operating Instructions Manual page 8

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
e
5.1. Base station
* Usethe base to position the base station on a level surface.
5.2. Measuring station
* You can also position the measuring station on a level outdoor surface.
* We recommend installing the measuring station securely on an outdoor wall using
the opening (12). Install an anchor, screw, nail, etc. in the wall of your choice
* Hang up the base/measuring station using the opening intended for this purpose
6. Operation
Hold down the « button (7) or the w button (9) to select values faster.
6.1. Connection to the measuring station
+ After you insert the batteries, the base station automatically searches for а
connection to the measuring station and performs initial setup.
* Initial setup takes approx. 3 minutes.
* Do not press any buttons during setup. Otherwise, values may not be
transmitted correctly and there is a risk of value errors and inaccuracies.
+ The setup process is completed when the indoor (3) and outdoor (1)
measurement data is displayed.
* If the base station still does not receive a signal from the measuring station , press
and hold the « button (7) for approx. 3 seconds to start the manual search for
the signal.
e
23126man
de en el es fr it pl ru skindd
6
30.10.14
10:2

Advertisement

loading

This manual is also suitable for:

123126