Heating Delay Regulation; Heating Maximum Power Regulation; Gas Table - Ariston CLAS X Training Manual

Wall hang boiler, conventional compact
Table of Contents

Advertisement

Training manual CLAS X
5.3.7

HEATING DELAY REGULATION.

5.3.8

HEATING MAXIMUM POWER REGULATION.

The boiler has two different maximum power: one for sanitary and one lower for heating (absolute maximum
heating power).
The absolute maximum heating power is set by parameter
eventually modified only and exclusively in the case of a gas change.
OUTLET PRESSURE ABSOLUTE MAXIMUM HEATING POWER (mbar)
24 kW CF
28 kW CF
24 kW FF
28 kW FF
32 kW FF
To adjust the heating power at the heating circuit there is maximum heating power regulation (between
minimum heating and absolute maximum heating power).
5.3.9

GAS TABLE

- Regulation carried out on parameter
This boiler has a regulation that allows to change the delay
time between the heating request and the burner ignition
choosing between 0 and 7 minutes. This regulation is carried
out on parameter
2 36
AGGIORNARE
- - Regulation carried out on parameter
 This boiler has a regulation that allows to change the
maximum heating power by means of parameter
AGGIORNARE
2 36
.
2
30. This parameter must be verified and
G20
G30
11,3
26,5
11,2
27,2
12
25,9
12
26
10,1
25,7
2 31
G31
34
35
34,5
35,3
33
2
31.
Pag. 44 di 69

Advertisement

Table of Contents
loading

Table of Contents