Time Schedule Setting; Exclusion Schedule - Ganz ZN-AIBOX-STD/PRO User Manual

Table of Contents

Advertisement

2.
For yearly schedules that use the Date-based option, you can specify the dates for each
target month. For example, you can set up a schedule on the 1st, 15th, and the last day of
January to March.

6. Time Schedule Setting

The time schedule is set to run on the specified date. The time schedule follows the policy
below.
1.
If the start time is faster than the end time, the schedule will be applied according to the
specified time in the day. (e.g., 09:00~18:00)
2.
If the start and end time are the same, the schedule will be applied for the entire 24 hours of
that day. (e.g., 00:00~00:00)
3.
If the start time is later than the end time, the schedule will be applied from the start time of
that day until the end time of the next day. (e.g., 21:00~09:00)

7. Exclusion Schedule

You can set a schedule as an exclusion schedule, which takes priority over the regular schedule.
If any of the exclusion schedules are active during the scheduled time of an event action, the
action will not be triggered.
76

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zn-aibox-stdZn-aibox-pro

Table of Contents