Electrical Installation Procedure - DAVIS eVO DVC10-A7KGP1E Installation And Operation Manual

Table of Contents

Advertisement

Note: 1. For the DVC10-A11KGP1E charger, the maximum continuous working current is 16A, and the cable
should meet the above requirements. It is recommended to use a 12 AWG cable with a 600Vac withstand voltage
rating.
2. For the DVC10-A22KGP1E charger, the maximum continuous working current is 32A, and the cable
should meet the requirements outlined above. We recommend using a 10 AWG cable with a 600Vac withstand
voltage rating. However, you can opt for a larger cable size if desired.
3. For single-phase AC chargers, the power cable can have a sheath, but its maximum allowable diameter
should not exceed the range shown in the diagram above; otherwise, assembly cannot be completed.

4.2 Electrical installation procedure

Since the connection of the cable is made in the rear plate of the charger, the electrical installation work should be completed
before the mechanical installation.
(1) Cable pre-treatment
Measure the actual length of the AC power cable according to the installation location of the charger, and pretreat the
cable (If possible, crimp the cable to a tubular terminal for subsequent connection) for preparation.
Remove the rear plate maintenance cover
Use a screwdriver to remove the maintenance cover screws, revealing the terminal connected to the AC cable and the
power distribution module.
Please keep the maintenance cover and fixing screws aside for future use.
A: Wiring terminal;
C: Screws;
Note: Be sure not to discard the related parts when removing the maintenance cover, such as waterproof seals and securing
screws
Pre-install cables
(2)
Loosen the waterproof jacket of the cable by turning it counterclockwise.
Insert the pre-treated cable into the waterproof jacket, leaving a cable length of approximately 10~15mm based on the
installation position for easy access to the terminal. (Note: Crimping the cable to a tubular terminal is essential for a
secure connection.)
To secure the waterproof jacket, turn it counterclockwise until it's tightened.
Loosen the cable waterproof jacket
B: Maintenance cover plate;
D: Waterproof seal.
Cable and waterproof jacket installation
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evodvc10-a11kgp1eEvodvc10-a22kgp1e

Table of Contents