Removing The Shuttle Hook - ELNA Supermatic Service Manual

Hide thumbs Also See for Supermatic:
Table of Contents

Advertisement

22. Removing the Shuttle Hook

Removing the Shuttle
If shuttle hook must be removed for some reason, proceed as follows: 
Remove needle, presser foot, needle plate and feed dog. Open shuttle cover and remove the bobbin. 
Loosen the Oil Hole Screw on bottom of shuttle assembly. 
Caution! Do not loosen the three screws at the bottom of the 
shuttle hook. 
On machines with the Automatic Thread Release device, the 
Guard Ring Stop must also be removed. 
Caution! The Guard Ring Stop will have to be readjusted once 
removed. 
Lift out shuttle assembly. 
Replacing the Shuttle
Turn the flywheel towards you until the needle is in its lowest position. 
Note! It is assumed that, before removing the Shuttle Assembly, the timing of the shuttle hook in relation to the 
needle bar was correct. If that is not the case, the timing will need to be adjusted at this time. 
Insert the Shuttle Assembly so that the point of the shuttle hook is about 2.4 mm [3/32"] before the needle. 
On machines (Serial No 527,625 or earlier) the shuttle beak must be lodged between the Shuttle Stop and the 
Stop Spring. 
On machines (Serial No 527,626 to 1,104,935), the shuttle beak must be lodged inside of the recess of the 
Automatic Thread Release. 
On machines (Serial No 1,104,936 or later), the shuttle beak must be lodged in the notch of the Guard Ring 
Stop. 
Adjustment can be made by lifting the Shuttle Assembly out again and advancing or retarding the shuttle hook 
by one gear tooth at a time. 
Replace The Oil Hole Screw, feed dog, guard ring stop, needle plate, presser foot and needle. Close the shuttle 
cover to its working position. 
39 
 

Advertisement

Table of Contents
loading

This manual is also suitable for:

Transforma

Table of Contents