Configuring The Ccc 2 Electronic Controls; Completing The Installation - Dometic 3314998.000 Installation Manual

Heater kit
Table of Contents

Advertisement

Installation
q
6 Mechanical ceiling template
q
7 Electronic ceiling template
S 10-16 x .50 screw
q
4. Secure the heater guard to the ceiling template
S 10-16 x .50 screws.
5. Perform one of the following steps:
– If the air conditioner is not installed, return to the
installation manual to complete the installation.
– If the thermostat is a CCC 2, go to "Configuring
the CCC 2 Electronic Controls" on page 6.
– If you removed the ADB during preinstallation, go
to "Completing the installation" on page 6.
6
w
w
Heater guard
w
6.1 Configuring the CCC 2 Electronic
Controls
q
8 Electrical control box
Dip switches
q
1. Remove the electrical control box cover.
q
9 Dip switch position
Off
q
2. Place dip switch 6 in the on position.
3. Replace the electrical control box cover.
4. Continue with "Completing the installation" on
page 6.

6.2 Completing the installation

1. Follow the steps to remove the ADB in reverse order.
2. Reconnect the 120 VAC and 12 VDC power supplies.
3. If the thermostat is a CCC 2 reset the system.
Heater Kit
w
On
w
EN

Advertisement

Table of Contents
loading

Table of Contents