Indesit HGM 20.B Manual page 10

Built-in cooker
Table of Contents

Advertisement

Available languages

Available languages

The appliance must be installed only by a qualified
person in compliance with the instructions provided.
The manufacturer declines all responsibility for improper
installation which may harm persons and animals and
damage property.
Important: The power supply to the appliance must be
cut off before any adjustments or maintenance work is
done on it.
Installation of Built-in Ovens
In order to ensure that the built-in appliance functions prop-
erly, the cabinet containing it must be appropriate. The
figure below gives the dimensions of the cut-out for instal-
lation under the counter or in a wall cabinet unit.
580
555
595
N.B.: Installation in compliance with the consumption declaration
In order to ensure adequate ventilation, the back panel of
the cabinet unit must be removed. Installing the oven so
that it rests on two strips of wood is preferable. If the oven
rests on a continuous, flat surface, there must be an ap-
erture of at least 45 x 560 mm.
The panels of the adjacent cabinets must be made of heat-
resistant material. In particular, cabinets with a veneer ex-
terior must be assembled with glues which can withstand
temperatures of up to 100 °C.
In compliance with current safety standards, contact with
the electrical parts of the oven must not be possible once
it has been installed.
All parts which ensure the safe operation of the appliance
must be removable only with the aid of a tool.
To fasten the oven to the cabinet, open the door of the
oven and attach it by inserting the 4 wooden screws into
the 4 holes located on the perimeter of the frame.
Instalation
Electrical Connection
The cooker must be connected to the mains electricity
supply. The hob is connected to the cooker using a special
connector. The cookers are designed to operate on
alternating current featuring the supply voltage and
frequency indicated on the appliance data plate.
560
+4 -0
558
min
Fitting on a Power Supply Cable
Opening the terminal board:
To install the cable, proceed as follows:
10
BUILT-IN HOB
WHITE
RED YELLOW BLUE
BUILT-IN COOKER
Using a screwdriver, prise on the side tabs of the
terminal board cover;
Pull open the cover of the terminal board.
unscrew the wire clamp screw and the contact screws
Note: the jumpers are factory-set for a three-phase
400V connection (fig. D).
to make the electrical connections illustrated in fig. F
and fig. G, use the two jumpers housed in the box (fig.
E - reference "P")
fasten the supply cable in place with the clamp and
close the cover of the terminal board.
Only on
certain models
GREEN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hgm 20.b ix

Table of Contents