Prepare The Site; Prepare The Whirlpool - Kohler K-874-H Installation Manual

Table of Contents

Advertisement

Available languages

Available languages

Position
the rough
plumbing

1. Prepare the Site

NOTICE: Unless otherwise specified, floor support under the whirlpool must provide for a minimum of 80
lbs./square foot (390 Kg./square meter) loading.
- Make sure the flooring offers adequate support for your whirlpool, and verify that the subfloor is flat and level.
- The whirlpool should be installed in an alcove installation. Construct 2x4 stud framing designed for your
particular installation. Construct a frame in accordance with the roughing in information packed with the
whirlpool.
- Position the plumbing according to the roughing in information packed. Cap the supplies, and check for leaks.

2. Prepare the Whirlpool

- Install the drain to the whirlpool according to the drain manufacturer's instructions. Do not connect the trap at
this time.
- Position a clean drop cloth or similar material in the bottom of the whirlpool. Be careful not to scratch the surface
of the product.
A
1011683-2-
Verify that the subfloor
offers adequate support,
and is flat and level
Construct 2x4
stud framing
according to
the roughing-in
information
4
Kohler Co.

Advertisement

Table of Contents
loading

Table of Contents