HARD 1935 Service Manual page 21

Springfield crib
Table of Contents

Advertisement

SLIDE ROD OR SIDE RAIL REPLACEMENT CONT.
3. Push down on both slide rods until they are clear of the upper crib eye, then lean the
entire side assembly outwards. Lift the assembly up and off of the lower crib eyes
being careful not to lose any of the small parts at the bottom of the slide rods as the spring,
washers and spacer will fall off .
Nylon Washers
Lower Crib Eye
3. Lastly, squeeze the Johns Hopkins handle or the Fingertip Release mechanisms on the
rail to disengage the trigger mechanisms while lifting the slide rod(s) up and out of the rail.
To reassemble the crib or bed with the new rail or slide rod:
1. Take the rail making sure the Johns Hopkins handle or the Fingertip Release
mechanisms are facing outwards and at the top of the rail. Insert the slide rod(s) down into
each end of the side rail. Again be sure that one person is squeezing the Johns Hopkins
handle or the Fingertip Release mechanism of the new rail to disengage the trigger
mechanisms as you do this. Raise the rail up until it is at the highest position and then
release the Johns Hopkins handle or Fingertip Release to lock the rail in place.
2. At the bottom of both of the slide rods, put the spacer back on fi rst, then a washer, the
bumper spring, and the other washer as shown on the previous page. While holding those
parts in place, lift the side assembly up and position it on the lower crib eye.
3. Lean the side assembly in towards the crib and then press down at both ends to get the
assembly under upper crib eyes and then release. Reinstall the hardware back on the top
of the slide rods. Do not overtighten the screw.
Please be sure all hardware is securely fastened prior to putting the crib or bed back
in service.
Disassembly is now complete.
Reassembly is now complete.
21
Spacer
Bumper Spring
Slide Rod Adaptor

Advertisement

Table of Contents
loading

This manual is also suitable for:

194319551975

Table of Contents