Huawei LUNA2000-200KTL-H0 User Manual page 87

Smart power control system
Table of Contents

Advertisement

LUNA2000-200KTL-H0 Smart Power Control System
User Manual
Step 5 Install the new Smart PCS.
Step 6 Connect the ground cable, DC power cables, AC power cables, and
communications cables in sequence. For details, see
Step 7 Power on the Smart PCS. Observe the LED indicators to check the running status
of the Smart PCS and verify that the replacement is successful.
----End
Follow-up Procedure
Step 1 Power on the system. For details, see the system power-on section in the
LUNA2000-2.0MWH Series Smart String ESS User Manual .
Step 2 Log in to the SmartLogger WebUI, enter the deployment wizard, and click Search
for Device to check cable connections and allocate addresses.
Issue 05 (2022-06-30)
Figure 9-20 Removing the Smart PCS
Copyright © Huawei Technologies Co., Ltd.
9 Device Maintenance
5 Electrical
Connections.
81

Advertisement

Table of Contents
loading

Table of Contents