This Commissioning Checklist is to be completed in full by the competent person who commissioned the heat pump and associated equipment as a means of
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission this equipment to the manufacturer's instructions may invalidate the warranty but does not affect statutory rights.
Customer Name
Address
Heat Pump Make and Model
Heat Pump Serial Number
Commissioned by (print name)
Company Name & Address
Building Regulations Notification Number (if applicable)
CONTROLS - SYSTEM AND HEAT PUMP
1. Time & Temperature
Control to Heating
2. Time & Temperature
Control to Hot Water
3. Heating Zone Valves
4. Hot Water Zone Valves
5. Thermostatic Radiator Valves
6. Heat Pump Safety Interlock
[3]
7. Outdoor Sensor
8. Automatic Bypass System
9. Buffer Vessel Fitted
ALL SYSTEMS
The heating system has been filled and pressure tested
Expansion vessel for heating is sized, fitted & charged in accordance with manufacturer's instructions
The heat pump is fitted on a solid/stable surface capable of taking its weight
The system has been flushed and cleaned in accordance with BS7593 and heat pump manufacturer's instructions
What system cleaner was used?
What inhibitor was used?
Are all external pipeworks insulated?
Is the system adequately frost protected?
VENTILATION SYSTEM
Duct work fitted and pressure tested in accordance with manufacturer's instructions
Air Vents fitted
Ventilation air flow measured/recorded in accordance with building regulations & manufacturers instructions
Air filter cleaned & correctly fitted
CENTRAL HEATING MODE
Heating Flow Temperature
DOMESTIC HOT WATER MODE
Is the heat pump connected to a hot water cylinder?
Hot water has been checked at all outlets
ADDITIONAL SYSTEM INFORMATON
Additional heat sources connected
Gas Boiler
Oil Boiler
ALL INSTALLATIONS
The heating, hot water and ventilation systems complies with the appropriate Building Regulations
All electrical work complies with the appropriate Regulations
The heat pump and associated products have been installed and commissioned in accordance with the manufacturer's instructions
The operation of the heat pump and system controls have been demonstrated to the customer
The manufacturer's literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Commissioning Engineer's Signature
Customer's Signature
(To confirm demonstration of equipment and receipt of appliance instructions)
Notes: [1] Installers should be members of an appropriate Competent Persons Scheme. [2] All installations in England and Wales must be
notified to Local Area Building Control (LABC) either directly or through a Competent Persons Scheme. A Building Regulations Compliance
Certificate will then be issued to the customer. [3] May be required for systems covered by G3 Regulations
© Heating and Hotwater Industry Council (HHIC)
EXHAUST AIR HEAT PUMP COMMISSIONING CHECKLIST
[2]
Tick the appropriate boxes if applicable
Room Thermostat &
Programmer/Timer
°C
Heating Return Temperature
Unvented
Electric Heater
Other
Telephone Number
Certified Operative Reg. No.
Commissioning Date
Telephone No.
Programmable
Load/Weather
Roomstat
Compensation
Cylinder Thermostat &
Programmer/Timer
Fitted
Fitted
Fitted
Fitted
Fitted
Yes
°C
Vented
Thermal Store
[1]
Optimum Start
Control
Combined with Heat
pump main controls
Not Required
Not Required
Not Required
Provided
Not Required
Not Required
No
If YES,
Volume
Yes
Yes
Yes
Yes
Qty
Yes
Yes
Yes
Yes
Yes
Yes
Not Connected
Yes
Yes
Yes
Yes
Yes
Yes
www.centralheating.co.uk
Litres
litres
No
N/A
l/s