Installation Testing - Audex AW Pro Series Manual

Table of Contents

Advertisement

Installation Testing

Installation Testing
1. Operation – This is a general guide and location specific considerations must be taken into account to
ensure safety.
i. Attach the hose / pipework
ii. Put the pump into the fluid in its final location
iii. Turn the pump on to ensure everything works correctly. Please note that if the pump is turning
in the wrong direction, it will still pump in the same direction but the flow will be reduced
(normally around 60%), and the pump life will be very dramatically shortened.
12

Advertisement

Table of Contents
loading

Table of Contents