Mitsubishi Electric PLFY Series Technical & Service Manual page 32

Split-type, heat pump air conditioners
Hide thumbs Also See for PLFY Series:
Table of Contents

Advertisement

OPERATING PROCEDURE
8. Removing the fan motor (MF)
(1) Remove the turbo fan. (See Photo 8 and refer to
procedure 7)
(2) Remove the lead cover (tapping screw 4×10: 2 screws).
(See Photo 10)
(3) Loosen the 2 clamps.
(4) Remove the 3 nuts and washers (M5).
(5) Remove the fan motor.
(6) Remove the 3 rubber mounts.
Figure 3: Partial cross section
Fan motor
Rubber mount
Note: When re-attaching the motor mount, make sure
that the thicker end faces the motor shaft.
9. Removing the panel
(1) Remove the electrical box fixing cover. (See Photo 1)
(2) Disconnect the connector for vane motor (CNV: White).
(Refer to procedure 5)
(3) Loosen the 4 corner panel fixing screws
(tapping screw 4×16). (See Figure 4)
(4) Slide the corner panel to the direction of the arrow 1, and
remove the corner panel. (See Figure 4)
(5) Remove the 4 installation screws (M5×28).
(See Photo 11)
(6) Release the 2 temporary hanging hooks to remove the
grille. (See Photo 12)
TCH124A
Photo 10
Clamps
(2 points)
Washer and nut
Figure 4
Photo 11
Photo 12
32
PHOTOS/FIGURES
Nuts and washers
Rubber mounts
Lead cover
Lead cover
fixing screws
Coil plate
Corner panel
Close-up
Grille
Corner panel
Temporary hanging hook
Fan motor
Screw
Installation
screw

Advertisement

Table of Contents
loading

Table of Contents