Finalizing Installation - LG RESU3.3 Installation Manual

Table of Contents

Advertisement

5.5 Finalizing installation
Follow these steps to finalize the installation.
1. Check if the configuration switches on the RESU Plus and both battery packs are set
properly, referring to Configuring RESU Plus on page 42 and Configuring Battery
pack on page 40.
2. Turn on the battery pack as described in Commissioning battery pack on page 44.
3. Replace the front cover and tighten the screws to a torque of 1 N·m.
RESU Plus Installation
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Resu6.5Resu10Resu plusR4863p3sR48126p3sR48189p3s

Table of Contents