Installation Clearance; Securing Battery Pack To Wall - LG RESU3.3 Installation Manual

Table of Contents

Advertisement

Battery Pack Installation
4.5

Installation clearance

300 mm
Make sure to leave a space of at least 9 mm between the battery pack and the wall.
A clearance of at least 9 mm must be left around the battery pack for proper cooling.
NOTE
Make sure that the battery pack is always exposed to the ambient air. The battery pack
is cooled by natural convection. If the battery pack is entirely or partially covered or
shielded, it may cause the battery pack to stop operating.
4.6 Securing battery pack to wall
Secure the battery pack to a wall to prevent it from moving. If the battery pack is installed
above the floor or on a platform, make sure that the wall or platform is capable of supporting
the battery pack's weight.
26
300 mm
300 mm
9 mm
300 mm
300 mm
300 mm
300 mm
9 mm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Resu6.5Resu10Resu plusR4863p3sR48126p3sR48189p3s

Table of Contents