Space Requirements And Intervals - Viega Geopress K Instructions For Use Manual

Table of Contents

Advertisement

Position of the repair end
Position of the standard end
3.3.2

Space requirements and intervals

Pressing between pipelines
Geopress K repair coupling
When mounting, observe the positioning of clamping ring and sliding
coupling.
When mounting, observe the positioning of clamping ring and sliding
coupling.
The minimum distance between pipelines is 50 mm for all dimensions.
Handling
14 from 23

Advertisement

Table of Contents
loading

This manual is also suitable for:

9715.5

Table of Contents