Installation - Hitachi air Core 700 Operation Installation Maintenance Manual

Hide thumbs Also See for air Core 700:
Table of Contents

Advertisement

4. Indoor Unit Installation

4.3 Installation

4.3.1 Mounting of Suspension Bolts
Step1
Select final location and installation direction of the indoor unit paying careful attention to the space
for the piping, wiring and maintenance.
Step2
Mount suspension bolts, as shown in Fig.4.2.
*For Concrete Slab
ceiling or wall
Steel
4.3.2 Installation Template
(1) A template for installation is in the carton of indoor unit. Use it to decide an installation location
and direction of the unit.
(2) Press the Pattern Board tightly onto the surface, mark out the hole position for suspension bolts
with a pencil.
4.3.3 Mounting Position of the Indoor Unit
Resin
Side Cover
Insert
150 to 160mm
(100 to 150kg)
Concrete
Anchor Bolt
(W3/8 or M10)
Fig.4.2 Mounting of Suspension Bolts
Ceiling
Wall
Fig.4.3 Pattern Board
Air outlet side
Fig.4.4 Mounting Position
*For Steel Beam
I Beam
Suspension Bolt
(W3/8 or M10)
Pattern Board
Model(HP)
2.0-2.5
3.0-6.0
Resin
Side Cover
-10-
A
B
912
990
1502
1580

Advertisement

Table of Contents
loading

Table of Contents