Preparing For Operation - Nos 02125NOS Owner's Manual

Table of Contents

Advertisement

2.8 Preparing for Operation

1.
Install a fully charged nitrous bottle. The pressure gauge should read 900-1000 psi at operating temperature/pressure.
2.
Slowly open the nitrous bottle valve while listening and looking for any leaks at the bottle fittings as well as the fittings on the
solenoids in the engine compartment.
3.
If no leaks are found, slightly loosen the -6 AN supply line fitting at the blue nitrous solenoid. Allow the air to leak from the fitting
until nitrous starts to fog out, then retighten the fitting. NOTE: Nitrous is very cold and can cause burning and irritation to the
skin, we recommend wearing gloves during this procedure.
12
Figure 13 Electric Wiring Diagram

Advertisement

Table of Contents
loading

This manual is also suitable for:

13125nos

Table of Contents