Rack-Mounting - Pentair VME System Subracks 7 U User Manual

Table of Contents

Advertisement

VME System Subracks 7 U / 8 U
20836-716/-719/-815

3.2 Rack-Mounting

Warning!
Do NOT move the a full equipped system by yourself. Due to the weight at
least two persons are needed to accomplish this task
Warning!
Do NOT stack the system on top of any other equipment. If the system falls, it
can cause severe bodily injury and damage the equipment.
This subrack system can be installed in 19" equipment racks. The rack must be
accessible from the front and rear for equipment installation.
Mounting brackets and a rack mount kit come with the system. Allow sufficient
clearance around the rack for system maintenance.
Mounting Instructions:
• Ensure that the rack is constructed to support the weight and dimensions of
the Shelf.
• Install any stabilizers that came with your equipment rack before mounting
or servicing the system in the rack.
• Load the rack from the bottom to the top, with the heaviest system at the
bottom, avoid uneven mechanical loading of the rack.
• We recommend to use also chassis support brackets.
www.schroff.biz
15
R1.0, September 22, 2006
Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vme system subracks 8 u20836-71620836-71920836-815

Table of Contents