Installation - Alpha E-Tec 15R Installation And Servicing Instruction

Wall mounted, fan assisted, room sealed, gas fired, high efficiency condensing regular boiler
Table of Contents

Advertisement

5

INSTALLATION

5.1
UNPACKING
1.
The boiler carton also contains the following:-
Connection kit (union bends, washers and gas service cock)
Mounting bracket plus screws and wall plugs
Condensate discharge pipe
Literature pack and Wall template
A suitable Alpha flue system must be selected to use with the boiler.
Notes: a. All flues must be suitable for Alpha condensing boilers.
b. CD 750 mm and 1000 mm flue extensions are available, if required.
Damaged products must not be used.
2.
Unpack boiler and remove the loose items, packs and mounting bracket.
Note: The boiler can be stood in an upright position (only while the valves and union bends are not
fitted).
It is recommended that two persons lift the boiler.
5.2
CLEARANCES REQUIRED - Fig. 5.1
600 mm
300 mm
Minimum clearances
5.3
PREPARE THE WALL - Fig. 5.2
1.
Decide upon the position of the boiler taking into account the clearances required
for servicing and the flue terminal position.
2.
Tape the template to the wall (ensure it is level and the right way
up) and mark the position of the holes for the boiler mounting
bracket. If rear exit flue is used, mark the position of the hole for
the flue.
3.
Side exit flue - Continue the horizontal centre line of the flue
across the wall to the side wall, then along the side wall 138 mm
(ensure the lines are horizontal). This will give the position of the
centre of the hole for the flue.
4.
Cut the 110 mm diameter hole (or use a 107 mm core drill) in
the wall for the flue.
Notes: 1. Ensure the hole is horizontal.
2. For internal fitting of the flue, using the flue sealing
collar supplied, cut a 130 mm dia. flue hole using a 127
mm core drill.
5.
Drill the fixing holes (10 mm dia.) to accept the No.10 plugs
supplied. Using the screws supplied, fit the mounting bracket.
16
Alpha E-Tec 15, 20, 25R - Installation
5 mm
Minimum
clearance
of 450 mm
from front
of boiler
235 mm - Can be reduced to
150 mm when using a
vertical flue
390 mm
5 mm
250 mm
Fig. 5.1
Rear exit hole
110 mm dia.
MET ER
E HOL E DIA
in) MIN FLU
110 mm (4.3
C/L OF FLU
E
HEA TIN G
HEA TIN G
RET URN
FLO W
(22 mm )
(22 mm )
E EXI T:
IF SID E FLU
SS WALL
ONTAL LY ACRO
E LINE HORIZ
SIDE WALL
CONTI NUE CENTR
ONTAL LY ALONG
THEN HORIZ
FLUE.
TO SIDE WALL.
E OF HOLE FOR
WILL GIVE CENTR
DOWN
138 mm. THIS
SION(S ) SLOPE
FLUE EXTEN
ENSUR E THE
MINIM UM OF
25 - 30mm
BOILE R BY A
TOWA RDS THE
SION(S ) USED.
OF FLUE EXTEN
PER METRE
BOI LER
BRA CKE T
MO UNT ING
ES
FIXI NG HOL
MIN IMU M SID
5 mm
CLE ARA NCE
CKE T
BOT TOM BRA
ES
FIXI NG HOL
CAS ING
BOT TOM OF
GAS
(22 mm )
TOM
MIN IMU M BOT
250 mm
CLE ARA NCE
Ensure line is level
CLE ARA NCE
MIN IMU M TOP
141 mm
m
AL FLUE 235m
HORI ZONT
m
FLUE 150m
VERT ICAL
ING
TOP OF CAS
Fixing holes
for mounting
bracket
Boiler bottom
E
fixing holes
Outline of
boiler
Template
Fig. 5.2
138 mm
Position of
110 mm hole
to be cut for
side exit flue

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-tec 20rE-tec 25r41 532 4941 532 5041 532 51

Table of Contents