Polaris TBM 200 MH Series Installation, Operation And Maintenance Manual page 19

Table of Contents

Advertisement

INSTALLATION, OPERATION AND MAINTENANCE MANUAL
POLARIS - SERIES TBM 200 MH ( 8" ) - TYPE PHO / PBO / PVO
DOCUMENT NBR. :
A0460
7.0
WET END INSTALLATION
Inspect and inventory all parts before you begin assembly. Clean all parts and
remove protective coatings as required. Inspect the motor module for any visual
damage paying particular attention to the shaft end and mechanical seal. Remove
any protective coatings from the shaft end and check to make sure that the tapped
hole in the end of the shaft and the key seat are free of any shavings and dirt. Prior
to the physical assembly of the wet end, familiarize yourself with all of the
components and the assembly sequence by reading the assembly instructions and
the enclosed explosion drawings. Based on your particular pump model and size
gather the necessary tools as per the following tool list.
TOOL REQUIREMENTS
Series TBM - 200 MH - Type "PHO"
-
-
-
-
-
Series TBM - 200 MH - Types "PBO" and "PVO"
-
-
-
-
-
-
REVISION:
Allen wrenches 5/8" - 14 mm - 6 mm, Torque Wrench
Plastic or Rubber Hammer
Nickel Based "Never-Seize" or "Molykote®"
Loctite® 262 High Strength or Devcon® Super Lock 2271
Loctite® 242 Medium Strength
Allen wrenches 5/8" - 14 mm – 8 mm - 5 mm, Torque Wrench
Open ended wrench
Plastic or Rubber Hammer
Nickel Based "Never-Seize" or "Molykote®"
Loctite® 262 High Strength or Devcon® Super Lock 2271
Loctite® 242 Medium Strength
3
2" or 51 mm
19of 29
EFFECTIVE
03-02-2016
DATE:

Advertisement

Table of Contents
loading

Table of Contents