Polaris TBM 150 MH Series Installation, Operation And Maintenance Manual

Electro-submersible pump

Advertisement

Quick Links

INSTALLATION, OPERATION AND MAINTENANCE MANUAL
POLARIS - SERIES TBM 150 MH ( 6" ) - TYPE PHO / PBO / PVO
PED-015
DOCUMENT NBR. :
POLARIS SERIES TBM 150 MH ( 6" ) TYPE PHO / PBO / PVO
PUMP TYPE:
POLARIS PART NBR.:
HP / V / Hz / Poles:
INSULATION:
EXPLOSION PROOF:
CONTINUOUS IN AIR
HIGH AMBIENT 90 Deg.C :
LOW AMBIENT -25 Deg.C :
EQUIPMENT OPTIONS:
IMPELLER TRIM:
POWER CABLE:
INTERNAL SLURRY SEAL
SLURRY BOSS
SLURRY BOSS QUENCH RING
LIGHT DUTY SLURRY SEAL
SEAL GUARD
WATER JET RING
WATER COOLING JACKET
COAL TAR EPOXY
DUROMAR
PUMP SERIAL NUMBER:
DATE:
CUSTOMER:
CUSTOMER P.O. NBR.
SHIPPED TO:
REVISION:
ELECTRO-SUBMERSIBLE PUMP
®
EPOXY
2
EFFECTIVE
DATE:
TBM 150 MH ( 6" ) TYPE (
700.200.05.
/
F
H
(
) mm (
TOTAL
(FEET)
1of 30
08-23-2011
)
/
/
) in.

Advertisement

Table of Contents
loading

Summary of Contents for Polaris TBM 150 MH Series

  • Page 1 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 1of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: POLARIS SERIES TBM 150 MH ( 6" ) TYPE PHO / PBO / PVO...
  • Page 2: Table Of Contents

    INSTALLATION, OPERATION AND MAINTENANCE MANUAL 2of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: TABLE OF CONTENTS SECTION 1.0 INTRODUCTION SECTION 2.0 WARRANTIES SECTION 3.0...
  • Page 3 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 3of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: SECTION 6.0 OPERATION PRE START UP CHECK PUMP START UP...
  • Page 4 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 4of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: INTRODUCTION Your new Series TBM pump has been designed and manufactured to perform for many years with a minimum of maintenance.
  • Page 5: Warranties

    INSTALLATION, OPERATION AND MAINTENANCE MANUAL 5of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: WARRANTIES Seller warrants that the products covered by this contract conform to applicable drawings and...
  • Page 6: Safety

    INSTALLATION, OPERATION AND MAINTENANCE MANUAL 6of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: SAFETY Do not install the equipment other than in accordance with the instructions contained in this manual.
  • Page 7: Receiving Inspection

    INSTALLATION, OPERATION AND MAINTENANCE MANUAL 7of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: INSTALLATION 4.1 RECEIVING INSPECTION The unit must be inspected immediately upon arrival and any irregularities and damages due to shipment must be reported to the carrier and POLARIS PUMPS.
  • Page 8: Used Pump Storage

    INSTALLATION, OPERATION AND MAINTENANCE MANUAL 8of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: 4.2.2 USED PUMP STORAGE A used pump should be completely disassembled and all parts cleaned and inspected.
  • Page 9: Pump Set Up / Mounting

    INSTALLATION, OPERATION AND MAINTENANCE MANUAL 9of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: PUMP SET UP / MOUNTING 4.5.1 CABLE AND CHAIN SUSPESION Pumps of SERIES TBM are fitted with integral lifting lugs sized to accommodate the dead weight of the pump assembly.
  • Page 10: Primary Seal Flush Piping

    INSTALLATION, OPERATION AND MAINTENANCE MANUAL 10of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: 4.6.2 PRIMARY SEAL FLUSH Polaris pumps equipped with the standard, run dry capable internal slurry seal arrangement do not require an external seal flush or cooling.
  • Page 11: Electrical Installation

    INSTALLATION, OPERATION AND MAINTENANCE MANUAL 11of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: ELECTRICAL INSTALLATION GENERAL Power supply and electrical work must be as per local and national codes. All wiring and installation of cables, relays, disconnects, etc., should be performed by qualified...
  • Page 12 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 12of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: OPERATION PRE-START UP CHECK A pre-start up check should always be performed prior to putting your pump into service.
  • Page 13 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 13of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: PUMP START UP Whenever possible, start the pump in clear liquid to prime discharge piping and/or hoses.
  • Page 14 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 14of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: PUMP SHUT DOWN Never stop the pump while pumping solids through the system. This will plug the piping.
  • Page 15 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 15of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: TROUBLE SHOOTING 6.4.1 FAULT TRACING To carry out fault tracing on electrical equipment, a multi-meter, test lamp and wiring diagram are required.
  • Page 16 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 16of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: FAULT SIGNAL AT THE STARTER, PUMP CAN BE STARTED MANUALLY Check for faulty level-control system components (start or high water sensors).
  • Page 17 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 17of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: PUMP IS EXPECTED TO STOP BUT KEEPS RUNNING If the pump has been running satisfactory and is capable of emptying the sump to the control stop level, check for leakage in discharge piping and connections.
  • Page 18 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 18of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: PUMP IS RUNNING WITH REDUCED FLOW This can be caused by either pump and / or system related problems.
  • Page 19 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 19of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: WET END INSTALLATION Inspect and inventory all parts before you begin assembly. Clean all parts and remove protective coatings as required.
  • Page 20 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 20of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: TBM 150 MH - TYPE PHO Drawing A0266 and A0278 Refer to Appendix 8.4 (A0432) for Fastener Torque requirements...
  • Page 22 POLARIS PUMPS - SERIES TBM - 150 MH TYPE PHO A0278 (Rev.2) ITEM ITEM ITEM PART NUMBER QTY. DESCRIPTION EXT. DESC.1 MODEL1 MODEL 2 WT.(KG) WT.(lbs) MTL. DWG. # 151.200.05.00564 KIT, WET END - BASIC TBM 150MH 470.33 1034.83 101.012.05.00554...
  • Page 23 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 23of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: TBM 150 MH - TYPE PBO Drawing A0267 and A0279 Refer to Appendix 8.4 (A0432) for Fastener Torque requirements...
  • Page 25 POLARIS PUMPS - SERIES TBM - 150 MH TYPE PBO A0279 (Rev.2) ITEM ITEM ITEM PART NUMBER QTY. DESCRIPTION EXT. DESC.1 MODEL1 MODEL 2 WT.(KG) WT.(lbs) MTL. DWG. # 151.200.05.00564 KIT, WET END - BASIC TBM 150MH 470.33 1034.83 101.012.05.00554...
  • Page 26 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 26of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: TBM 150 MH - TYPE PVO Drawing A0268 and A0280 Refer to Appendix 8.4 (A0432) for Fastener Torque requirements...
  • Page 28 POLARIS PUMPS - SERIES TBM - 150 MH TYPE PVO A0280 (Rev.2) ITEM ITEM ITEM PART NUMBER QTY. DESCRIPTION EXT. DESC.1 MODEL1 MODEL 2 WT.(KG) WT.(lbs) MTL. DWG. # 151.200.05.00564 KIT, WET END - BASIC TBM 150MH 470.33 1034.83 101.012.05.00554...
  • Page 29 INSTALLATION, OPERATION AND MAINTENANCE MANUAL 29of 30 POLARIS - SERIES TBM 150 MH ( 6” ) - TYPE PHO / PBO / PVO PED-015 08-23-2011 DOCUMENT NBR. : REVISION: EFFECTIVE DATE: APPENDIX PUMP GENERAL ARRANGEMENT DRAWING, TBM 200 MH – PHO, PBO, PVO TBM 150 MH –...
  • Page 39 AC Submersible Pump Motors Installation & Operating Manual 4/09 MN414...
  • Page 40 Any trademarks used in this manual are the property of their respective owners.
  • Page 41 Table of Contents Section 1 General Information ................1−1 Overview .
  • Page 42 Section 1 General Information ii Table of Contents MN414...
  • Page 43 Section 1 General Information Overview This manual contains general procedures that apply to BaldorSReliance Motor products. Be sure to read and understand the Safety Notice statements in this manual. For your protection, do not install, operate or attempt to perform maintenance procedures until you understand the Warning and Caution statements.
  • Page 44 Section 1 General Information Safety Notice Continued WARNING: Pacemaker danger − Magnetic and electromagnetic fields in the vicinity of current carrying carrying conductors and permanent magnet motors can result result in a serious health hazard to persons with cardiac pacemakers, metal implants, and hearing aids. To avoid risk, stay way from the area surrounding a permanent magnet motor.
  • Page 45 Section 2 Installation & Operation Overview Installation should conform to the National Electrical Code as well as local codes and practices. All BaldorSReliance Submersible Pump Motors Include thermal devices as standard. Normally, there are four conditions during which a submersible sewage pump may be operated in gases or vapors.
  • Page 46: Installation

    WARNING: Do not touch electrical connections before you first ensure that power has been disconnected. Electrical shock can cause serious or fatal injury. Only qualified personnel should attempt the installation, operation and maintenance of this equipment. WARNING: The Adjustable Speed Controller may apply hazardous voltages to the motor leads after power to the controller has been turned off.
  • Page 47 Grounding In the USA consult the National Electrical Code, Article 430 for information on grounding of motors and generators, and Article 250 for general information on grounding. In making the ground connection, the installer should make certain that there is a solid and permanent metallic connection between the ground point, the motor or generator terminal housing, and the motor or generator frame.
  • Page 48 Moisture Protection The submersible moisture protection system consists of the non−wicking cable cap assembly and the dual moisture sensing probes. The cable cap assembly prevents moisture from wicking through the cable assembly even when the cable jacket has been punctured. Dual moisture sensing probes (Warrick type) extend into the oil chamber located between the tandem mechanical seals.
  • Page 49 Installation (for reference only) Note: Since changes occur, always refer to installation and connection documentation from the manufacturer and follow their procedures. All type 2800−XXX controls are identified by a specific component number which follows the format 2800−XXX where the X’s are replaced by numbers and letters indicative of the A−C supply line voltage and frequency, contact configuration and enclosure.
  • Page 50 Section 1 General Information WARNING: Surface temperatures of motor enclosures may reach temperatures which can cause discomfort or injury to personnel accidentally coming into contact with hot surfaces. Protection should be provided by the user to protect against accidental contact with hot surfaces. Failure to observe this precaution could result in bodily injury.
  • Page 51 Baldor District Offices...
  • Page 52 BALDOR ELECTRIC COMPANY World Headquarters P.O. Box 2400 Fort Smith, AR 72901−2400 (479) 646−4711 Fax (479) 648−5792 www.baldor.com © 2009 Baldor Electric Company All rights reserved. Printed in USA MN414 4/09...
  • Page 53 ENGINEERING STANDARD PROCEDURE 1of 2 IMPELLER INSTALLATION – TECH BULLETIN DOCUMENT NBR. : REVISION: EFFECTIVE A0431 09-26-2003 DATE: SCOPE: The purpose of this Engineering Standard Document is to define the procedure to be followed in installing the Impeller and Impeller Lock Screw. METHOD: –...
  • Page 54 ENGINEERING STANDARD PROCEDURE 2of 2 IMPELLER INSTALLATION – TECH BULLETIN DOCUMENT NBR. : REVISION: EFFECTIVE A0431 09-26-2003 DATE: – – Remove all oil or grease from Impeller Screw. Install O-rings onto Impeller Screw and Impeller Cap (Model PHO) or Shaft Adapter (Models PBO, PVO).
  • Page 55 ENGINEERING STANDARD PROCEDURE 1of 1 FASTENER TORQUE – TECH BULLETIN DOCUMENT NBR. : REVISION: EFFECTIVE A0432 01-17-2006 DATE: SCOPE: Assembly Pre-Load / Bolt Torque requirements for Metric Fasteners of Grades A2-70 (304L) A4-70 (316L) and 8.8, for Sizes M4 to M20. METHOD: ASSEMBLY TORQUE / ASSEMBLY PRE-LOAD TIGHTENING TORQUE...

This manual is also suitable for:

Tbm 150 mh phoTbm 150 mh pboTbm 150 mh pvo700.200.05

Table of Contents