2. Press the vacuum valve lock release and remove the plug from the
valve.
3. Attach the vacuum pump tubing insert into the valve and push until
it clicks and locks in place.
4. Pump the hand pump until the vacuum gauge reaches 5-10 inches
Hg.
5. Watch and listen for leaks. A leak is indicated by movement of the
gauge towards zero after you finish pumping. Significant leaks can
generally be found within a few minutes.
6. Press the lock release and remove the vacuum pump from the
valve.
7. Install the valve plug into the valve and push until it clicks and
locks in place.
10
5
in Hg
17