Installation; Scope; General; Set-Up - AEC GP1200 Series Operation And Installation Manual

Granulators
Table of Contents

Advertisement

3

3-1 Scope

3-2 General

3-3 Set-up

- 16 -
This section contains all instructions required for
experienced installation personnel to install the AEC
granulator and prepare it for production. It is essential to
follow all instructions carefully and in the sequence
presented. Be sure to observe all DANGER, WARNING,
and CAUTION statements in order to prevent personal
injury or machine damage, and to observe all NOTE
statements which are designed to assist in the performance
of procedures.
The site selected for installation of the granulator should be
prepared in advance. Be certain that the area to be
occupied by the machine is clean, level and free of
obstructions. The site selected must have a floor rated to
easily support the weight of the machine. A concrete floor
of 4" minimum in thickness is recommended.
Make certain the floor is clean, level, and free of
obstructions before placing the machine into position.
Visually inspect the hopper infeed opening to insure that no
stray packing material or debris are present.

Installation

Advertisement

Table of Contents
loading

Related Products for AEC GP1200 Series

This manual is also suitable for:

Gp1212Gp1218Gp1224

Table of Contents