Download Print this page

Pre-Assembly - Yamaha MQT-8023 Assembly Manual

Free floating lug bridge

Advertisement

PRE-ASSEMBLY

MATERIALS NEEDED FOR ASSEMBLY:
Phillips screwdriver
n
" Adjustable wrench (ratcheting socket wrench preferred)
7
n
16
FFLB™ = Free Floating Lug Bridge
n
• Metal bridges are pre-installed and take the place
of a normal lug casing
• Black spacers are pre-installed onto shells
Please be careful when using tools
HAVE YOU ORDERED A CARRIER WITH THE DRUMS?
YES: Proceed with assembly
4
NO: Do NOT proceed. The carrier's tom rail is
essential to properly assemble these drums.
RM-ABSF-Q
*Note: Optional gas shock system shown
- only available on the RM-ABSF-Q
Yamaha Marching Toms and Randall May Free Floating Lug Bridge Assembly Instructions - V0823
RM-FCEP-Q
Tom Rail
1
Bridges (top) and spacers

Advertisement

loading