Download Print this page

Install Air Tank; Connect Air Lines - Graco 24K335 Instructions Manual

Air compressor and receiver tank for reactor e-30i and e-xp2i integrated plural component proportioning systems

Advertisement

Install Air Tank

Reference parts illustration, Parts, page 8.
1. Connect nipple (26), water drain valve (16),
connector (15), and connector (31) to bulkhead
(30). Apply PTFE sealant on threads.
2. Install bulk head assembly to bracket wall (6).
3. Install bushing (47), tee (48), two ball valves (17),
and two connectors (15) to bulkhead (30). Apply
PTFE sealant on threads.
4. Install connector elbow (41) to bottom of tank (4).
5. Remove desiccant housing and fill with all
desiccant pellets provided. See Desiccant Air
Drying System manual 309921.
6. Connect air dryer assembly (33) to bracket (6)
with screws (39), nuts (40), and clamp (38).
7. Mount tank (4) on bracket (6) with screws (12)
and nuts (11). Mount bracket assembly to the
compressor frame with three screws (9), one
screw (10), and four nuts (11).
3A1902C

Connect Air Lines

Reference Fig. 1, page 4.
1. Cut tube (36) to the following lengths (see next
2. Push one end of a 48 in. (1219 mm) section fully
3. Push all tubing sections fully into push-to-connect
4. Connect air hoses (23) and (24) as shown.
Get other manuals https://www.bkmanuals.com
page):
a. Three – 48 in (1219 mm)
b. 9 in. (228.6 mm)
c. 25 in. (635 mm)
into compression fitting (37). Tighten 3/4 turn
past finger tight.
fittings as shown.
Install Air Tank
3

Advertisement

loading