Product Installation

IP16GESP2 is designed according to the standard 19-inch rack size. The specific
installation steps are as follows:
1. Check rack grounding and stability
2. Install the two L-brackets in the accessory on each side of the switch panel and
3. Place the switch in an appropriate place in the rack and be supported by the
Note:
8
secure with the screws provided in the accessory.
bracket. Screw the L-shaped bracket to the guide groove fixed on both ends
of the rack to ensure that the switch is stable and horizontally installed on the
rack.
A good grounding rack is a piece of anti-static, anti-leakage, anti-jamming
and lightning protection equipment that is an important guarantee to ensure
that the rack ground wire is properly installed.
Make sure equipment is installed within the rack from the bottom up, to avoid
overload.
Avoid placing other heavy objects on top of the switch to avoid accidents and
ensure that there is heat dissipation and air circulation.