Download Print this page

ETC 7123K1028-REPLC Installation Manual page 3

Power control processor mk2 replacement kit

Advertisement

ETC Installation Guide
PCP Mk2 Replacement Kit
Move a RideThru Option Card - ERP Mains Feed, ERP Feedthrough,
or EchoDIN
If your ERP Mains Feed, ERP-FT, or EchoDIN panel has a RideThru Option Card, follow the
instructions below to move it to the new PCP-Mk2.
1. Disconnect the red-and-black harness from the old user interface's two-pin "ride thru"
header.
2. Remove the three screws securing the RideThru Option Card to the old user interface.
• Set the three screws aside for reinstallation.
• Keep any spacers that were installed with these screws. You will need a total of three
spacers to install the RideThru Option Card on the new user interface. Two spare spacers
(ETC part number HW9444) are included in the Power Control Processor Mk2
Replacement Kit.
3. Secure the RideThru Option card to the new user interface with the three screws you
removed above, placing one spacer on each screw between the user interface and the
RideThru Option Card bracket.
4. Connect the free end of the red-and-black harness on the RideThru Option Card to the two-
pin "ride thru" header on the new user interface.
Connect the Wiring to the PCP-Mk2
CAUTION:
from the termination board, ensure that the connector is aligned pin-for-pin
with the header on the termination board when you reinstall it. If you misalign
the pins you may damage the equipment.
1. Install the gray ribbon cable to the header on the new user interface and secure it with the
retainer clip (included, ETC part number HW7519).
2. Install the free end of the six-color power wiring harness (7123B7021)  to the new user
interface at J3 "POWER".
• If you disconnected this harness from the termination board, ensure that the connector
is aligned pin-for-pin with the header on the termination board when you reinstall it.
3. ERP Mains Feed and Sensor IQ only: Install the free end of the five-color power sense wiring
harness (7123B7001) to the new user interface at J5 "DIGITAL POT".
4. ERP Mains Feed only: Install the free end of the three-color wiring harness (7123B7004) to
the new user interface at J6 "RELAY BUS".
5. Connect the network patch cable to the new user interface.
PCP Mk2 Replacement Kit
If you disconnected the six-color power wiring harness (7123B7021)
Page 3 of 5
ETC

Advertisement

loading

This manual is also suitable for:

7123a1321