Table of Contents

Advertisement

Quick Links

5.8
DT-E
TECHNICAL AND OPERATIONAL DOCUMENTATION
INSTALLATION MANUAL,
OPERATING MANUAL AND INSTRUCTIONS FOR SAFE USE
(Translated from the original manual)
5. Steel and aluminium components and structural sets
5.8. Pergola SB400

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SB400 and is the answer not in the manual?

Questions and answers

Summary of Contents for SELT SB400

  • Page 1 DT-E TECHNICAL AND OPERATIONAL DOCUMENTATION INSTALLATION MANUAL, OPERATING MANUAL AND INSTRUCTIONS FOR SAFE USE (Translated from the original manual) 5. Steel and aluminium components and structural sets 5.8. Pergola SB400...
  • Page 2 THIS TECHNICAL AND OPERATIONAL DOCUMENTATION:  Is valid from: 01 August 2023  Is applicable to the above listed product versions. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 2 / 64...
  • Page 3: Table Of Contents

    WARRANTY EXCLUSIONS ............................63 APPENDIX 1 (PICOLO XL MOTOR OPERATING MANUAL) ......................64 APPENDIX 2 (24V DC MOTOR OPERATING MANUAL) ......................64 DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 3 / 64...
  • Page 4: Introduction

    - warranty coverage against product defects. Keep the operating manual for safety of people. INFORMATION No harmful or dangerous consequences for people or facilities. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 4 / 64...
  • Page 5: Terms And Definitions

    For the purposes of this documentation the following terms and definitions shall apply: Product: PERGOLA SB400 Pergola SB400 system is made of powder-coated aluminium profiles and stainless components. Roof framework made of movable aluminium blades. The angle of inclination of the blades can be changed. Product design is offered in colour from RAL colour chart after confirmation of their availability by the manufacturer.
  • Page 6: Subject, Intended Use And Contents Of The Documentation

    SELT Sp. z o.o. shall not be responsible for damages resulting from non-observance of the recommendations included in this documentation. For further improvement of the product, SELT Sp. z o.o. reserves the right to introduce changes, which, while maintaining significant technical parameters, will be considered as appropriate for increasing the quality of product operation and safety of use.
  • Page 7: Product Technical Information

    Pergola SB400 – free-standing Fig. 1. Pergola SB400 free-standing – Overall dimensions: B max – maximum width, L max – maximum projection, H max – maximum frame height (3012 mm), H1 max – maximum height of the clearance, H2 max – maximum height of position of the mechanism intended to change the angle of the blades (~3140 mm).
  • Page 8 Detailed data for parameters of the individual motors are available on the websites of motor manufacturers and on the website: www.selt.com→ OUR OFFER → ELECTRIC EQUIPMENT DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 8 / 64...
  • Page 9: Product Specification

    COMLETENESS AND QUAL ITY CONDITION OF DELIV ERY Goods produced by SELT Sp. z o. o. are in accordance with their production technology. In the event of any reservations as to the product or damage to the product packaging, the reservations or comments should be reported to the driver / warehouseman / assembly team and marked on the WZ document under pain of losing claims in this respect, and a protocol describing these reservations or comments should be drawn up with the driver's participation.
  • Page 10: General Conditions For Transport And Storage Of The Product

    Prior to installation and use of the product please read carefully the operation and maintenance manual available at the following website: https://www.selt.com/dte-en DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 10 / 64...
  • Page 11: Product Installation

    This chapter contains general requirements concerning the product installation. Correct assembly is a necessary condition for smooth operation of the product. SELT Sp. o.o. recommends using only professional assembly crews, which guarantee the Purchaser that the conducted installation will be correct.
  • Page 12: General Guidelines For Product Installation

    Walls or floor should be load-bearing and adapted for transferring of forces from product anchoring.  SELT shall not be responsible for damages caused by use of too weak anchoring components or fixing in the floor with too small load bearing.
  • Page 13: Installation Tools

    Elastic recovery >75% (ISO 7389) Application temperature from +5 °C to +35 °C INSTALLATION TOOLS Installation instructions, operation and maintenance manual and instructions for safe use are available at www.selt.com after logging in. List:  drill bits for metal and concrete, ...
  • Page 14: Installation

    INSTALLATION Fig 4a. View of the assembly of elements of free-standing Pergola SB400. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN...
  • Page 15 Fig. 4b. View of the assembly of elements of wall-mounted Pergola SB400. (note: wall bracket in a new version: universal bent) DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 15 / 64...
  • Page 16 Fig. 5. View of the assembly of modular Pergola SB400. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 16 / 64...
  • Page 17 Before proceeding with the assembly, it is necessary to verify the visual condition of the packaging of the elements delivered for assembly, the visual condition of the elements and their completeness. For damages arising after the delivery (transfer of risk) SELT Sp. z o.o. is not responsible. ...
  • Page 18 We recommend using screws/anchors of 12 mm diameter for fixing the footing to the substrate. Fig. 8a Placement of the crossbeams of the SB400 pergola At their ends, in the area of bones, the beams have special openings ø 30 for cable routing (fig.
  • Page 19: Installation Of The Standard Feet

    Fit M8 sleeve nuts with M8 threaded stud on both sides and tighten with a torque of 17 Nm (fig. 12). Figure 12 DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 19 / 64...
  • Page 20: Installation Of The Frame

    Before assembling the frame, slide into the groove of the sealing blade of one crossbeam, where it is fixed as “U” (gutter)- fig. 13. For the second crossbeam, the gasket is not used. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN...
  • Page 21: Free-Standing Version With 2 Gutters

    4. Repeat this step for the other lengthwise beam. Ensure that the free ends of both lengthwise beams are securely supported. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 21 / 64...
  • Page 22 10. In case of aligned feet – trace the final position of feet and anchors. 11. Anchor the product to the ground (anchors are not supplied by SELT). The size of anchors is M12. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400...
  • Page 23: Free-Standing Version With 4 Gutters

    When inserting the profile avoid abrasion of the sealing layer and apply EPDM to the beam wall only after aligning the contours of the holes. Tighten with 2 countersunk screws M5x8 (in external oval holes with deepening) (fig. 19). DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 23 / 64...
  • Page 24 19. Fasten both lengthwise beams to the post’s bone of the second cross frame from the side of the upper chamber of the beam, each using four countersunk screws M8 x 20 with Allen sockets. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN...
  • Page 25: Wall-Mounted Version With 2 Gutters

    22. In case of adjustable feet carry out the final levelling and drilling of the bone to lock in the selected foot extension. 23. Anchor the product to the ground (anchors are not supplied by SELT). The size of anchors is M12.
  • Page 26 16. In addition, the joints at the ends of the connection of the wall beams with the lengthwise ones should be sealed (the top of the joint and the vertical joint from the inside of the pergola). DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN...
  • Page 27: Wall-Mounted Version - 4 Gutters

    Tighten the end cap 85x212 at the end of the cross beam on the side with the angular overflow. Each for 4 screws M4x8 (fig. 29). Repeat this step for the second cross beam. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 27 / 64...
  • Page 28 13. Screw the corner from above using 4 conical screws with M8x20 Allen socket (fig. 32-right). 14. Put up the whole frame (different assembly is allowed, e.g. in a standing position). DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN...
  • Page 29 26. In addition, the joints at the ends of the connection of the wall beams with the lengthwise beams (the top of the joint and the vertical joint inside the pergola) should be sealed. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN...
  • Page 30: Modular Installation

    (fig. 37), and in the beams coaxial through holes with deepening are made. Figure 37 DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 30 / 64...
  • Page 31: 4.6.5. Gutters Installation

    Also, apply an additional two loops of sealant around the holes at both ends of the oval overflow. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN...
  • Page 32 NOTE: Sealing from the inside of the end cap with the gutter reduces the risk of bursting the bottom chamber of the gutter in the event of a leak (including factory-installed ones). DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN...
  • Page 33: Installation Of Blades And Drive Unit

    NOTE: Press the slip rings carefully into the holes – lack of deep mounting may result in difficult connection with drive rod. Figure 45 DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 33 / 64...
  • Page 34 (fig. 47). NOTE: For selected models the motor may be factory fixed to the beam. Fig. 47 DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 34 / 64...
  • Page 35: Installation Of The Drive

    (as an inverted “U”). Reverse fastening results in not closing the blades and the risk of breaking the motor piston. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN...
  • Page 36 (DC 24 V) is absolutely required. Use the programming cable to open and close the blades twice. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 36 / 64...
  • Page 37: Wall Installation

     Cross beam (front or rear) of the roof.  Lengthwise beam (drive or bearing) of the roof. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 37 / 64...
  • Page 38 Wall brackets in the form of universal angle steel brackets (fig. 57). Permissible assembly methods according to Fig. 58. Forbidden installation methods according to Fig. 59. Figure 57 – Universal wall bracket (2 possible settings) DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 38 / 64...
  • Page 39 Sealing around the contour of the wall bracket at the contact with the wall and filling the triangular gap at the bend of the bracket is not performed by SELT and must be done on its own with a flexible sealing compound resistant to weather conditions.
  • Page 40: Wall Installation - Cross Beam

    3 anchors (2 horizontal and one in the middle above). 2. Insert the anchors (not in SELT delivery) in the substrate according to the selected anchoring system. Install both wall brackets, applying the tightening torques for the...
  • Page 41: Wall Installation - Lengthwise Beam

    3 anchors are required - two lower anchors with an axial spacing of 100 mm and the third one above in the middle of the distance (fig. 62 and 57). DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN...
  • Page 42: Foundation Guidelines

    Recommended anchors (chemical): - Fischer anchor FIS A M12x120, class 5.8 + FIS V resin (in case of additional grouting, reduce the depth of anchoring). DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN...
  • Page 43 STREFA III – ZONE III - 1,2 m STREFA IV – ZONE IV - 1,4 m Selt recommends making foundations of reinforced concrete of min. C20/25 with a minimum size of 45x45 cm and a height (fig. 64): a) in the case of non-heavy soils, min. 70 cm,...
  • Page 44: System Operation And Product Safety

    In the event of snowfall, as well as at temperatures lower than or equal to 0 degrees, the blade rotation mechanism must not be started.  Pergola SB400 should not be used, and you should not stay under it, during storm, hail, heavy snowfall, heavy rain (roof should be left opened). ...
  • Page 45: Special Requirements For Snow Load

    When snow accumulates, there will be visible and excessive deflections of blades and beams and the possibility of local leaks from blades and gutters. In addition, in Pergola SB400 the phenomenon of excessive post deflections and horizontal roof floating may occur.
  • Page 46 It is recommended to use wind automation to help meet safety conditions. If any abnormalities in product operation are detected then you should immediately inform the SELT Sp. o.o. service. Using damaged product and self-repairs pose a hazard for health and life and could be a reason of warranty invalidation.
  • Page 47: Connection To Electrical Installation

    CONNECTION TO ELECTR ICAL INSTALLATION When the Pergola SB400 is assembled one should proceed to connection of drive and control system to the previously prepared systems: electrical supply installation and control system. The obligation to prepare the installation lies with the installer/investor.
  • Page 48 (the profile and control unit are black), UV and in in the event of rain and snowfall, they lie in the water. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 48 / 64...
  • Page 49: Control

    Connecting the radio receiver Power supply Motor Picolo XL motor wiring Hirschmann socket STAK3+PE Hirschman plug STAS3+PE marking Blue Neutral Blue Neutral DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 49 / 64...
  • Page 50 Fig. 65 Diagram of the connection areas inside the Pergola io Louver control (descriptions in the lower magnification are given in bold in the table above) DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN...
  • Page 51: Start-Up And Adjustment

    The powered product does not move assigned to the receiver. Make the Delete procedure acc. to p. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 51 / 64...
  • Page 52 The transmitter is movement. programmed Or after power off The transmitter is programmed Cancellation Place the powered product in the middle position. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 52 / 64...
  • Page 53 Turn off the power and then do points 1, 3, 5, 7 and 8 DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 53 / 64...
  • Page 54 The linear motion path setting is incorrect. switches seems imprecise. The drive is on the verge of overheating. Wait until the drive has cooled down. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 54 / 64...
  • Page 55: Misuse Of The System

     Remote control should be kept away from children. The work area of the pergola SB400: crushing, cutting and pulling threat  Do not touch mobile components during closing or opening of the mobile roof. It can be a reason of crushing, cutting, pulling in, trapping between e.g.
  • Page 56: System Use And Maintenance

    If the product is used in other way than described in this documentation or modified without the authorization of SELT Sp. z o.o. then this is considered as misuse.
  • Page 57: Indications Of Risk, Breakdown Or Accident

    NOTE: This applies to the Picolo XL 230V motor, for DC motors there is usually no thermal fuse, therefore the controller should provide a limitation of the working time. DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 57 / 64...
  • Page 58: 6.4. Technical Inspection S And Repairs

    Technical inspections Performed on request for a fee by the SELT company or a specialized installer after the warranty period has expired. The scope is each time determined by a specialized assembly team, and the execution is confirmed by a service report.
  • Page 59: Complaint / Technical Defects

    Any incorrect/unusual operation of the system or abnormal noises of its operation require user intervention and notification to a specialized installer. Repairs are performed by SELT Sp. z o. o. or a specialized assembly team on the basis of a separate agreement.
  • Page 60: Marking And Labelling The Product With The Ce Mark

    MARKING AND LABELLING THE PRODUCT WITH THE CE MARK PRODUCT COMPLIANCE W ITH THE CE STANDARD The safe structure of the Pergola SB400 was made in accordance with EN 13659:2015 (roof) and EN-1090-1 (supporting structure in EXC2 class). THE SAFE STRUCTURE OF THE PERGOLA SB400 WAS MADE IN ACCORDANCE WITH EN 13659:2015 (ROOF) AND EN- 1090-1 (SUPPORTING STRUCTURE IN EXC2 CLASS).
  • Page 61 17 / DZ / 2020 EN 13659 External sun protection system. Resistance to wind load: class 6 DWU 158 / S / 2017 DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 61 / 64...
  • Page 62 DT-E 5.8: ALUMINIUM CONSTRUCTION – SYSTEM PERGOLA SB400 Edition 8 / August 2023 / EN page 62 / 64...
  • Page 63: Warranty Exclusions

    WARRANTY EXCLUSIONS General warranty conditions are available on www.selt.com. If the SELT Sp. z o.o. the website is inaccessible then warranty terms and conditions can be obtained from the sales representative of SELT Sp. z o.o. 10.1 WARRANTY EXCLUSIONS SELT Sp. z o.o. shall not bear responsibility for the following cases and the warranty will not cover: ...
  • Page 64: Appendix 1 (Picolo Xl Motor Operating Manual)

    Notwithstanding the above, the scope of responsibility of SELT Sp. z o. o. is limited and results from the contract concluded with the buyer of the product.

Table of Contents