Carrier 50FF/FC 020-093 Installation, Operation And Maintenance Instructions page 47

Table of Contents

Advertisement

12 - FACTORY OPTIONS AND ACCESSORIES
Step 2: Replace the panel (1). The following image shows the
panel by the outer side of the 50FF/FC unit. Then fi x the clamps
supplied to secure the pipes (3) and (4) (M6 Allen screws).
Boiler bracket
6
1
Clamps
Step 3: Remove the casing of the boiler to screw it to the panel
(1). To do this it is necessary to remove the locking screw, and
then, pull the front panel outwards and later to the top to decouple
it from points A.
M4 Allen fi xing
screws for the boiler
A
A
Locking
screw
Step 4: Drop the boiler on the bracket (6) and screw on the four
fi xings of this panel to secure (M4 Allen screws). Then reassemble
the casing.
Step 5: Finally join the boiler with the piping using elbows and
accessories factory-supplied.
Return from
hydraulic circ.
Pressure
Filling
gauge
valve 1/2"
Discharge to
hydraulic circ.
47