Carrier 50FF/FC 020-093 Installation, Operation And Maintenance Instructions page 25

Table of Contents

Advertisement

7 - POSITIONING AND INSTALLATION
7.7 - Recommended service clearance
Important: This is the minimum space required for maintenance operations and access inside the unit. Depending on the assembly
selected for the unit and the characteristics of the installation site, a larger space around it may be required to ensure proper air
circulation and therefore the correct operation of the unit.
50FF/FC 052-058-062-070-074-086-093: R1 and R2 assemblies
Overall dimension (mm)
50FF/FC
Length
Width
052 to 062
3.000
2.200
070 to 093
3.650
2.200
50FF/FC 052-058-062: RP assembly
Overall dimension (mm)
50FF/FC
Length
Width
052 to 062
3.865
2.200
50FF/FC 070-074-086-093: RP assembly
Overall dimension (mm)
50FF/FC
Length
Width
070 to 093
3.655
2.210
50FF/FC 052-058-062-070-074-086-093: RW assembly
Overall dimension (mm) Service clearance (mm)
50FF/FC
Length Width
Height
052 to 062
4.675
2.210
070 to 093
4.465
2.210
NOTE:
- Unit not designed to have overhead obstruction.
Service clearance (mm)
Height
A
B
C
1.230
1.000 1.000 1.300 2.200
1.230
1.000 1.000 1.600 2.200
Service clearance (mm)
Height
A
B
C
1.230
1.000 1.000 1.300 2.200
Service clearance (mm)
Height
A
B
C
1.905
1.000 1.000 1.600 2.200
A
B
C
D
1.905 1.000 1.000 1.300 2.200
1.905 1.000 1.000 1.600 2.200
D
D
D
D
A
D
D
D
A
A
B
B
A
B
B
C
C
C
C
25

Advertisement

Table of Contents
loading

Table of Contents