12.4 - Heat recovery wheel module (BW and RW
assemblies)
12.4.1 - Transport and handling
The module with the heat recovery wheel and its support bed are
supplied disassembled with the unit, for installation on site.
■ The module can be handled safely by using a forklift truck. The
base frame features guide rails to accommodate the forks of
the fork-lift truck. These guide rails avoid any slippage.
■ For transport and lifting up to the roof using a crane, a rocker
arm as well as approved slings must be used. These slings are
attached on the grips fi tted to the cover of the module.
Guide rails for forks
1
12.4.2 - Installation of models RW - 070 to 093 and BW
■ First, the fresh air housing (1) is connected. Follow the steps
detailed in paragraph 12.3.
■ Next, the front panel (2) is secured using 8x40 hex screws.
■ Then, the support bed (3) is fi tted. This is fi xed to the panel
using 4.8 self-tapping hex screws on the sides and 8x40 hex
screws on the front.
■ Next, the recovery module is positioned on the support bed but
without eff orts on it. Do not remove the fork-lift truck until the
module is not secured to the unit.
Note: on models 070 to 093 there is no such support bed.
■ The module is secured to the unit using 8x40 hex screws. To
do this, the side panels must be removed from the module. The
right-hand panel (front view) is secured using M6 Allen screws,
while the left-hand panel incorporates dual locks.
Note: Check that the locks are not blocked. Open the locks with
a 4 mm Allen key (anticlockwise).
■ The module is screwed to rest on the support bed using 8x40
hex screws on both sides.
■ Finally, raise the hoods (5) and secure the side parts. Follow
the steps detailed in the preceding paragraph.
Note: All the screws required for this assembly are supplied
secured on the module and the support bed.
36
Lifting grips
5
2
4
5
3
8x40 hex
screws
8x40
hex
Left-hand
Self-tapping
panels
hex screws
Electrical connection to be made by the costumer
Note: see the wiring diagram included with the unit for a more
detailed information about the wiring.
The connection is done trought the left-hand panels (front view).
Initial location of the cables for connection:
50FF/FC unit
BOX3
W58
2
BOX6
CTW
1
Connection to be made by the customer:
50FF/FC unit
BOX3
W58
2
BOX6
CTW
1
12.4.3 - Installation of models RW - 052 to 062
In this case, before carrying out the steps outlined above, the
return air fans module must be connected to the unit.
■ The module can be handled safely by using a forklift truck. The
base frame features guide rails to accommodate the forks of
the fork-lift truck. These guide rails avoid any slippage.
8x40 hex screws
Recovery module
BOX5
RT
W59
2
W59RRT
1
VRR
Recovery module
BOX5
RT
W59
2
W59RRT
1
VRR