Condensate Drain - Baxi Assure Combi 36 LPG Installation And Service Manual

High efficiency wall hung condensing gas boiler
Hide thumbs Also See for Assure Combi 36 LPG:
Table of Contents

Advertisement

5 Before installation
Fig.13
Pipework and method of termination
32mm
21.5mm
5
A
3
4
5
B
6
3
5
C
3
5
D
3
30
5.3.4
It is strongly recommended to discharge internally into the household
drainage system. If connecting to a rain water drain, that drain MUST dis­
charge into a foul drain.
2
1
2
3
4
5
6
7
8
9
10
11
12
Tab.18
Key
A
B
7
C
D
E
7
F
9
G
8
PN-0000389

Condensate drain

Pipework.
Insulation.
50mm per metre of pipe run — 2.5° minimum run.
450mm minimum is applicable to properties up to 3 storeys. For
multi-storey building installations consult BS 6798.
Boiler.
Sink.
Pipe must terminate above water level but below surrounding sur­
face. Cut end at 45°.
Holes in the soak-away must face away from the building.
500mm mimimum.
Basement or similar (heated)
Condensate pump
Unheated Location (e.g. Garage)
Examples are shown of the following methods of termination
Description
Termination to an internal soil and vent pipe.
External termination via internal discharge branch e.g. sink waste
— downstream (It is NOT RECOMMENDED to connect upstream
of the sink or other waste water receptacle!)
Termination to a drain or gully.
Termination to a purpose made soakaway Further specific re­
quirements for soakaway design are referred to in BS 6798
Pumped into an internal discharge branch (e.g. sink waste) down­
stream of the trap.
Pumped into an external soil and vent pipe.
Termination to a drain or gully with extended external run and
trace heating. The "Trace Heating" element must be installed in
accordance with the instructions supplied. External runs and
those in unheated locations still require insulation.

Advertisement

Table of Contents
loading

Table of Contents