Luxury Design™ Lighting; Water Supply - Electrolux EI32AF65JS Use And Care Manual

Built-in all freezer with iq-touch controls
Hide thumbs Also See for EI32AF65JS:
Table of Contents

Advertisement

Luxury Design™ Lighting and Water Supply
Luxury Design™ Lighting
The interior cabinet lighting features LED lights that
gradually ramp up in intensity after the door is opened.
To replace an LED:
Unplug the unit or switch the breaker that
supplies power to the unit to the off position
before changing an LED light.
1. Unplug the electrical cord or switch OFF the
power supply breaker.
2. Push down on the LED cover and then pull away
from the cabinet interior.
3. From the inside of the LED cover, remove the
wire harness connector by pressing on the latch
with a small fl at bladed screwdriver. Pull the wire
harness connector out of the LED.
4. Replace with a new LED and install in the reverse
order.

Water Supply

To avoid electric shock, which can cause death
or severe personal injury, disconnect the freezer
from electrical power before connecting a water
supply line to the freezer.
To Avoid Property Damage:
• Copper or Stainless Steel braided tubing is
recommended for the water supply line. Water supply
tubing made of ¼ inch plastic is not recommended to
be used. Plastic tubing greatly increases the potential
for water leaks, and the manufacturer will not be
responsible for any damage if plastic tubing is used
for the supply line.
• DO NOT install water supply tubing in areas where
temperatures fall below freezing.
• Chemicals from a malfunctioning softener can
damage the ice maker. If the ice maker is connected
to soft water, ensure that the softener is maintained
and working properly.
Ensure that your water supply line connections
comply with all local plumbing codes.
Before Installing The Water Supply Line, You Will
Need:
Basic Tools: adjustable wrench, fl at-blade
screwdriver, and Phillips
Access to a household cold water line with water
pressure between 30 and 100 psi.
Push on
A water supply line made of ¼ inch (6.4 mm) OD,
Underside of
Connector to
copper or stainless steel tubing. To determine the
Release Latch
length of tubing needed, measure the distance
from the ice maker inlet valve at the back of the
freezer to your cold water pipe. Then add
approximately 7 feet (2.1 meters), so the freezer
can be moved out for cleaning (as shown).
Remove Wire
A shutoff valve to connect the water supply line to
Harness
your household water system. DO NOT use a
Connection
self-piercing type shutoff valve.
A compression nut and ferrule (sleeve) for
connecting a copper water supply line to the ice
maker inlet valve.
TM
screwdriver
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ei32ar80qs

Table of Contents