Riello C9161400 Installation, Use And Maintenance Instructions page 21

Dual fuel light oil/ gas burners progressive two stage or modulating operation
Table of Contents

Advertisement

Key to the sequence diagrams:
Depending on the parameter, valve proving takes place:
between phase 62 and phase 70 or/and
between phase 30 and phase 32.
Signal ON Signal OFF Next phase
Parameter direct start
Checking with controller on
Deviation
No Rep. decrement
10
70
Without VP70 with VP80
62
Stop, up to Ph – max. time
Stop, up to Ph – max. time
0-3 s.
0-30 s.
0-3 s.
Input: don´t care
Output: OFF
Output: ON
Technical description of the burner
00, Rep = 0
01
12, Rep > 0
10
00, Rep = 0
01
12, Rep > 0
00, Rep = 0
01
12, Rep > 0
00, Rep = 0
01
12, Rep > 0
79
Param.
10
Assignment of times:
t0
Postpurge lockout position
t01
Max. time safety phase
t10
Min. time home run
t21
Min. time start release
t22
Fan runup time t30 Prepurge time part 1
t34
Prepurge time part 3
t36
Min. ON time oil pump
t38
Preignition time gas / oil
t42
Preignition time OFF
t44
Interval 1 gas / oil
t62
Max. time low-fire
t70
Afterburn time
t74
Postpurge time 1 gas / oil (tn1)
t78
Postpurge time 3 gas / oil (tn3)
t80
Valve proving evacuate time
t81
Leakage test time atmospheric pressure
t82
Leakage test filling test
t83
Leakage test time gas pressure
tmn1
Min. time extraneous light test (5 s.) after skip over of
prepurge
tmx1
Max. damper running time
tmx2
Max. time startup release
tmx3
Max. time circulation heavy oil
01
tn
Postpurge time
TSA1 Safety time 1
10
TSA2 Safety time 2
tv
Prepurge time gas / oil
19
GB
20037168

Advertisement

Table of Contents
loading

Table of Contents