Electrical Work - Zibro S 32 Series Installation Manual

Hide thumbs Also See for S 32 Series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 82
Fig. 19
ATTENTION
• Excessive torque can break nut depending on installation conditions.
• All refrigerant work and refrigerant piping should comply with the local legislation, standards
and codes and should only be done by qualified and skilled engineers.

ELECTRICAL WORK

7.
An individual branch circuit and single receptacle used only for this air conditioner must be available.
If model S(C)3248 is used, this has to be connected directly to the supply source. See the following
table for suggested fuse specifications:
>
NOTE!
4
96
Fig. 20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sc 32 series

Table of Contents