Section 5: Major Components; Figure 13: Major Component Descriptions - Roberts Gorden Vantage HE-40 Installation, Operation & Service Manual

Gas-fired, low intensity unitary heater designed for harsh environments
Hide thumbs Also See for Vantage HE-40:
Table of Contents

Advertisement

HE-S
I
, O
ERIES
NSTALLATION
PERATION AND

SECTION 5: MAJOR COMPONENTS

FIGURE 13: Major Component Descriptions

Burner with Tube Gasket
Burner Tube
Supplied in 10'
(3 m) lengths. Burner tube is
always the first tube after the burner.
Tube and Reflector Hanger
with Clamp Package
Position this hanger no more
than 4" (10 cm) away from
the burner.
Tube and Reflector Hanger
Suspend system from these
hangers.
Reflector Support Strap &
Wire Form
Vinyl Coated Flex Gas
Line with Shut Off Cock
12
S
M
ERVICE
ANUAL
Must be installed with the
flame observation
window facing down.
Reflector
(Stainless Steel
or Aluminum)
Alternate
overlap as shown
on overview and on Page
19, Figure 17. Minimum
overlap is 6" (16 cm).
Vent Cap
Tube
Attach at flue end
Heat Treated
and air inlet with
Aluminized tube supplied
vent adapter,
in 10' (3 m) lengths.
where required.
Turbulator must
be installed in the last
standard section of tube.
Turbulator is not required on the
HE-125/150/175. For installation
see Page 22, Section 6.5.
Coupling Assembly
with Lock
Reflector End Cap
Punch out center
section to
accommodate tube.
Vent Adapter
Turbulator

Advertisement

Table of Contents
loading

Table of Contents