Introduction

The condition of the system and any defects found must be documented with suitable
photos.
If an inspection point is marked "FAIL (F)", a more detailed description of the defect must be
given at the end of the checklist.
Criteria that cannot be checked, e.g. because they are not present, are to be marked with
"N/A".
The list must be filled in completely.
Defects that have been directly eliminated are to be entered in the defect list and marked as
completed.
Note
Carry out the tests after commissioning at the following intervals:
• 2 months after commissioning
• 6 months after commissioning
• 12 months after commissioning
After the first year, carry out the checks every 12 months or at shorter intervals if necessary
due to the ambient conditions.
4
Preventive Maintenance Checklist for SICHARGE UC
Product Information, 02/2023, A5E52548311-AA
1