Location; General - Bryant D Series Installation, Start-Up, And Operating Instructions Manual

Deluxe 4-way multipoise fixed-capacity direct-vent condensing gas furnace
Table of Contents

Advertisement

COLLECTOR BOX DRAIN TUBE
(BLUE AND WHITE STRIPED)
c. Install cap and clamp on UPPER inducer housing drain
connection where molded drain tube was removed.
d. Use inducer housing drain extension tube (violet label
and factory-supplied in loose parts bag) to connect
LOWER inducer housing drain connection to conden-
sate trap.
e. Determine appropriate length, cut, and connect tube to
condensate trap.
f. Clamp tube to prevent any condensate leakage.
3. Relief Port Tube
Refer to Pressure Switch Tubing section for connection
procedure.
C. Condensate Trap Field Drain Attachment
Refer to Condensate Drain section for recommendations and
procedures.
D. Pressure Switch Tubing
One collector box pressure tube (pink label) is factory connected to
the pressure switch for use when furnace is installed in UPFLOW
applications. This tube MUST be disconnected and used for the
condensate trap relief port tube. The other collector box pressure
tube (green label) which was factory connected to the condensate
trap relief port connection MUST be connected to the pressure
switch in DOWNFLOW or HORIZONTAL RIGHT applications.
NOTE: See Fig. 11 or tube routing label on main furnace door to
check for proper connections.
Relocate tubes as described below:
1. Disconnect collector box pressure tube (pink label) attached
to pressure switch.
2. Extend collector box pressure tube (green label) which was
previously connected to condensate trap relief port connec-
tion by splicing to small diameter tube (factory-supplied in
loose parts bag).
3. Route extended collector box pressure tube behind inducer
motor bracket then between inducer motor and pressure
switch.
CAP
PLUG
INDUCER HOUSING
DRAIN TUBE (VIOLET)
COLLECTOR BOX
EXTENSION TUBE
Fig. 11—Horizontal Right Tube Configuration
—11—
COLLECTOR BOX DRAIN TUBE (BLUE)
COLLECTOR BOX TUBE (GREEN)
COLLECTOR BOX EXTENSION TUBE
COLLECTOR BOX TUBE (PINK)
4. Connect collector box pressure tube (green label) to pres-
sure switch connection labeled COLLECTOR BOX.
5. Use remaining smaller diameter tube (factory-supplied in
loose parts bag) to extend collector box pressure tube (pink
label) which was previously connected to pressure switch.
6. Route this extended tube (pink label) to condensate trap
relief port connection.
7. Determine appropriate length, cut, and connect tube.
8. Clamp tube to relief port connection.
E. Condensate Trap Freeze Protection
Refer to Condensate Drain Protection section for recommenda-
tions and procedures.
F. Construct a Working Platform
CAUTION: The condensate trap MUST be installed
below furnace. See Fig. 4 for dimensions. The drain
connection to condensate trap must also be properly
sloped to an open drain.
Construct working platform where all required furnace clearances
are met. (See Fig. 3 and 10.)
NOTE: Combustion-air and vent pipes are restricted to a mini-
mum length of 5 ft. (See Table 6.)
NOTE: A 12-in. minimum offset pipe section is recommended
with short (5 to 8 ft) vent systems. This recommendation is to
reduce excessive condensate droplets from exiting the vent pipe.
(See Fig. 10 or 31.)
I. GENERAL
When a furnace is installed so that supply ducts carry air to areas
outside the space containing the furnace, return air must also be
handled by ducts sealed to furnace casing. The ducts terminate
CONDENSATE
TRAP

LOCATION

A93303

Advertisement

Table of Contents
loading

This manual is also suitable for:

350mav

Table of Contents