a. Jumper for 1-3 secs: Factory Test, defrost runs for 12 seconds or less.
Jumper for 5-20 secs: Forced Defrost, defrost runs for 30 secs if DFT1 is open
Table 15 — DFB Power: 24-V at Pin P3-1, COM at P3-3 (required in all modes)
INPUTS AND
PIN
OUTPUTS
INPUTS
Y1
P2-5
W1
P2-7
DFT
DFT1-DFT1
OUTPUTS
OD Fans
OF
Rev Valve
P3-7
Compressor
P3-10
Electric Heat
E-HEAT
W2
NOTE(S):
a. Single Circuit, two stage units are configured as two compressor unit on the defrost board.
b. DFT may be OPEN or CLOSED during Heat mode operation, depending on outdoor coil temperature. Defrost mode cannot start until Time window opens in DFB Defrost
mode logic.
c. Call for electric heat may originate at the space thermostat (space demand) or at the DFB during Defrost. Thermostat signal will also be present on 575J unit's W2 terminal
and the DFB's E-HEAT terminal.
Table 14 — 575J Defrost Board I/O and Jumper Configurations