Installing the IBM FlashSystem 820
Learn about initial setup and configuration of your IBM FlashSystem.
Unpacking the system
Your system is supplied with a packing list.
Ensure that you received all of the components listed.
1. Examine the external chassis for any damage that might have occurred during shipping.
2. Inspect the interface plate for any screws that might have loosened during shipping.
3. Inspect the front panel display for damage.
4. Report any meaningful damage.
1
© Copyright IBM Corp. 2013, 2014