Advertisement

Provers
ES 120, ES 160
Installation and Operation Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Provers ES 120 and is the answer not in the manual?

Questions and answers

Summary of Contents for Eloma Provers ES 120

  • Page 1 Provers ES 120, ES 160 Installation and Operation Manual...
  • Page 2: Table Of Contents

    Installation- and Operation Manual Provers ES 120 ; ES 160 Dear Customer, Prior to taking the appliance into service, please do read this manual carefully. It contains very important information on installation and operation of the appliance. Table of contents 1.
  • Page 3: Hints On Operational Safety

    Use for intended purpose The appliance shall only be used for its intended purpose, namely the professional preparation of food. Hints on operational safety Installation Follow the local regulations of the electricity supply companies and observe the instructions for the installation of kitchen equipment, as well as those given in the German Standards DIN 1988, part 4 and DIN 1986 part 1.
  • Page 4: Connect Water Supply

    Connect water supply The appliance is equipped with a G ¾ A water connection. Use a pressure-resistant, flexible hose 1/2" . Maximum water temperature 50 ° C Minimum water pressure : 200 kPa = 2 bar Maximum water pressure : 600 kPa = 6 bar In case of differing water pressure values a pressure-regulator must be installed.
  • Page 5: Starting The Appliance (Supervised Operation)

    Clean the appliance daily with a soft cloth or a sponge using normal cleaning agents. Use a special decalcifying cleaner, for instance the deliming agent eloma MULTI CLEAN (Art. No. 522007, 522008) to remove calcareous deposits from stainless steel parts.
  • Page 6: Trouble Shooting

    Trouble shooting If the appliance does not work properly, try to remedy the failure with the aid of the table below. Failure Possible reason Remedy LED in the ON/OFF touch is The power supply is not Plug it. not lit, the unit cannot be plugged started.
  • Page 7: Warranty Conditions

    Maisach/Germany or its representative. In case of recognised warranty, eloma bears the costs for spare parts, as well as labour and travel expenses of the service technician. If possible the repair work is done at the place of the machine's installation. In case the appliance has to be returned to the eloma factory in Maisach, for whatever reason, transportation expenses back and forth are always at the customer's account.
  • Page 8: Declaration Of Conformity

    Provers meet the requirements of the EEC Directive 89 / 336 In case of modifications without prior approval of our company, the present declaration shall no longer be valid. eloma GmbH provides the following technical documents for examination: Development sheets, design plans, drawings and operating instructions that meet the recognised rules for the elaboration of user information.

This manual is also suitable for:

Provers es 160

Table of Contents