Rheem GF951U Series Installation Instructions Manual page 30

Upflow & downflow/horizontal high efficiency condensing gas furnaces
Table of Contents

Advertisement

RXGY-G02 SIDE WALL VENT
This termination for horizontal venting
only.
IMPORTANT: Do not install on the
prevailing winter wind side of the
structure. Observe same clearances
specified for horizontal, standard
termination.
NOTE: Multi-venting-No common
venting.
FIGURE 26
VENT KIT INSTALLATION OPTIONS
B
FIGURE 27
VENT KIT INSTALLATION OPTIONS
2 inch
or
3 inch
piping
3
NOTE: Install the vent and air intake
piping into the vent plate openings.
Seal all gaps between the pipes and
wall. Be Sure To Use Silicone
Sealant to seal the vent pipe to the
vent cap to permit field disassembly
for annual inspection and cleaning.
Also seal all pipe penetrations in wall.
To prevent possibility of condensate
freeze-up or recirculation, do not
install vent kits one above the
other.
EXHAUST
AIR
INTAKE
REDUCING COUPLING,
FIELD SUPPLIED. (2" PIPE DOES
NOT REQUIRE COUPLING.)
NOTE: The vent illustration in Figure
27 can be used for Non-direct vent
terminations also.
For 90000 thru 105000 BTUH models-
reduce to a length between 12 inches
and 30 inches of 2 inch pipe.
for 45000 thru 75000 BTUH models-
when 3 inch pipe is used: reduce last 30
inches to 18 inches of 2 inch pipe.
Note Vent should protrude a
maximum of 2-1/4" beyond vent plate.
Air intake should protrude a maximum
of 1 inch beyond vent plate.
Seal all wall cavities

Advertisement

Table of Contents
loading

Table of Contents