Zenith ZBTS T-series 100 – 600 A, I N S TA L L AT I O N A N D O P E R AT I N G I N S T R U C T I O N

7. Installation

This equipment must only be installed by qualified electrical
personnel. Disconnect all sources of electrical supply before
performing installation. Consider all sources of power,
including the possibility of backfeeding.

7.1 Final System Inspection

Prior to energizing the Automatic Transfer
Switch:
1
Use a vacuum cleaner to remove all
debris caused by transport or
installation.
Warning
Do not use a blower since debris may become
lodged in electrical and mechanical compo-
nents and may cause damage and malfunction
of the switch.
Avertissement
N'utilisez pas de soufflerie car des débris
peuvent se loger dans les composants élec-
triques et mécaniques et peuvent endomma-
ger et provoquer un dysfonctionnement de
l'interrupteur.
2
Verify that all cabled connections are
correct and that phase rotation of
both sources match.
3
Check engine start connections.
4
Verify the correct connections of all
control wires.
5
Adjust any optional accessories as
required.
6
Check the lug torque values of the
power connections, see the lug
torque values in table 7.1.
7
Make sure that all covers and barriers
are installed and properly fastened.
Each ABB Zenith Bypass/Isolation Auto-
matic Transfer Switch is factory wired and
tested. A complete information package
is furnished with each switch which
includes:
• Sequence of operation.
• Description and operation of all acces-
sories supplied.
• Control panel connection diagram and
schematic.
• Description and identification of all cus-
tomer field connections.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zsdo120wb1s5tptx3x

Table of Contents